Choosing the location and surveying the conditions
The location of the well has to balance the ground conditions, the siting requirements and access for servicing. Choosing it only by the shortest pipe run to the house can make it harder to build or use the water source later.
Gather the data before you pick a point
Prepare a plot map showing the building, the boundaries, the sewage facilities and the routes of utilities. Also mark known objects on the other side of the fence. Check the applicable planning provisions in your municipality and any restrictions on the specific site.
PIG-PIB data helps you check the available information on water sources and hydrogeological conditions in the area. Maps and archive boreholes describe the survey of the area. They do not replace measurements of your future well, nor do they promise a particular depth.
Plan the whole connection to the building
Consider the length of the trench, the difference in height, the passage through the foundation and the space for the tank and filters. Check that the pump can be pulled out in the future. Do not plan any permanent structure above the wellhead that would prevent servicing access.
A place exposed to surface runoff or periodic flooding needs a separate assessment of how the water source is protected. Simply placing the cover above the lawn does not solve every sealing problem.
How to ask about your neighbours' wells
- When was the well built and what documents are available?
- What are its depth, diameter and pumping test result?
- Does the yield change with the seasons?
- What were the water test results, from which sampling point and on what date?
- Does the water need treatment, and how does the installation perform under higher demand?
Treat the information as background for a conversation with the contractor. A well of similar depth on a neighbouring plot may operate in different conditions.
Record your decision
For the point you choose, add the reasons for the choice, the person consulted and the issues still to be confirmed. Before ordering the works, check separately the formalities and distances described in the Regulations section.