Regulations and formalities

Well location and required distances

Check distances on a map of the whole surroundings, including beyond the plot boundary. An adequate distance does not replace an assessment of the tightness of the intake or the quality of the water.

Which case the stated values apply to

Section 31 of the technical conditions sets out distances for a well supplying water intended for human consumption that does not require a protection zone to be established. Distances are measured from the axis of the well. The list below applies to exactly this case; it is not a universal list for every type of water intake.

Basic distances

ObjectDistance under § 31
Plot boundary5 m, except as provided in para. 2.
Axis of a roadside ditch7.5 m.
Livestock buildings and the listed sealed waste storage facilities15 m; the detailed list is in the regulation.
Nearest drainage pipe carrying wastewater biologically treated to the required standard30 m.
Unpaved animal run and the listed infiltration systems without biological treatment70 m; check the scope in the regulation.

The boundary exception does not remove the other required distances. Location conditions must be checked for your specific plot.

Distances from the axis of the well: 5 m from the plot boundary, 7.5 m from the axis of a roadside ditch, 15 m from livestock buildings, 30 m from a drainage pipe, 70 m from an unpaved animal run
Distances under § 31 for a well supplying drinking water, without a protection zone. The scale of the axis is illustrative; the exceptions and the full list are given in the regulation.

What to mark on the sketch

Mark the buildings, boundaries, septic tank, wastewater treatment plant, drainage field, ditch, animal runs and known sources of contamination. Do not assess a treatment plant only by the position of its tank: the route of the infiltration may matter too.

Add existing and planned installations on your own plot and known structures on your neighbours' land. Note where the data comes from and what you have not yet been able to confirm. Do not replace an unknown distance with zero or a guess.

Before you order the borehole

Give the sketch to the contractor or designer. Establish the planning, protection and site constraints, and access for servicing. If the conditions cannot be met or the scope of the regulation is unclear, an assessment of the specific location is needed before work starts.

Sources:

Checked 8 October 2026

Read and plan further

Next guideDocuments, offices and official forms

Contact

Need help with your well?