Well costs and comparing the scope of quotes
Compare quotes on the same scope. The price for the borehole does not automatically describe the cost of water supplied to the house.
What to put in the budget
Separate the borehole, the well equipment, the pump with its protections, the controls, the connection, the groundworks, the electrical supply, the test and any water treatment. For each item mark: included in the price, extra, already owned or to be agreed.
A missing price for materials does not mean zero cost. Do not compare a labour-only total with a quote that includes equipment and pipes. Note separately the deadlines, the method of acceptance and the terms for settling unforeseen work.
How to read ARCHE rates
According to the price list read on 8 October 2026, drilling a borehole up to 30 m costs PLN 9,000 net. Each further metre beyond that range costs PLN 250 net, depending on the variant and diameter. The terms must be confirmed in the quote.
Pump installation for PLN 700 net and a complete connection for PLN 1,500 net are alternative labour scopes. Do not add them together automatically. Materials need a separate quote. The calculator does not decide how a borehole that does not reach the expected result is charged.
Compare net amounts with net, or gross with gross. Copy the VAT rate from the specific quote. We do not assume a single rate for all projects.
Questions before you accept
- What casing, screen, gravel pack, wellhead protection and pumping does the price include?
- Who approves deepening the borehole and the additional cost, and when?
- How are travel, difficult ground, trenches and restoring the surface charged?
- Which devices and materials have specified models or parameters?
- What documents will you receive at acceptance?
Cost after commissioning
When assessing whether it pays off, add energy, tests, servicing and the consumables used by water treatment. If the water later goes into the sewer, agree with the operator how wastewater is charged. Saving on buying water does not automatically mean the sewage charges disappear.