Planning a well

Preparing the plot for drilling

Before the crew arrives, confirm the access conditions and the work area. A well-prepared plot reduces downtime and the risk of damaging existing installations.

Send the contractor the access details

Take photos of the entrance, the bends, the slope of the ground and the planned work area. Measure the gate clearance and any places that may restrict passage. The contractor confirms the dimensions of the work area needed for the specific machine. Do not assume that a passenger car being able to get in means that a drilling rig can.

Report soft ground, paving, fresh embankments, overhead lines across the plot and underground objects. Agree in the quote how the surface will be protected, the route of the vehicles and any costs of restoring the ground.

Mark the utilities and the limits of the works

Provide up-to-date information on cables, mains water, sewerage, gas, drainage and the septic tank. A map is no substitute for confirming the course of the utilities on site. The borehole location and the routes of any trenches should be agreed before work begins.

  • Mark the places the crew should not drive onto.
  • Arrange access for the owner or a person who can make decisions.
  • Secure the area against children and animals.
  • Decide where to put the equipment and the material brought up from the borehole.

Agree what happens to pumped water and the clean-up

Ask where and how the water will be discharged during drilling and pumping. Do not direct it on your own initiative onto a neighbour's land, into the sewer or into a watercourse. The contractor should assess the conditions and agree a method that complies with them.

Note who provides the necessary utilities, what protection of the borehole will remain at the end of each day and who cleans up the work area. If the connection will be made later, agree a temporary protection for the water source.

The day before work starts

Confirm the time, the phone number of the decision-maker and the agreed location. Keep photos of the condition of the surface. Prepare the quote and a list of questions, especially about increasing the depth and accepting the additional cost.

Read and plan further

Next guideChoosing the location and surveying the conditions

Contact

Need help with your well?

Describe your needs or the symptoms. You can add the planner summary, test results and photos of the installation.

Other guides in this section

Free quote form

We call back within 24 hours

OFERTEO