40 m deep well
A 40-metre deep well is an ideal compromise between investment cost and hydraulic yield for owners of detached houses in Poland. According to the latest market data for 2026, the total cost of building a 40-metre well is PLN 16,460-19,765, and the investment pays for itself on average after 9-17 years compared with the cost of drawing water from the municipal mains.
Compare the figures for other depths: 30 m well, 50 m well. The borehole depth is chosen to suit the conditions on the plot.
- High-quality water from the depths
- Gain independence and never worry about running out of water
- Lower costs compared with mains water
How much does a 40 m deep well cost in 2026
Cost of a borehole 40 metres deep
At ARCHE, drilling a 40 m deep well costs PLN 11,500 net under the 2026 price list: PLN 9,000 for a borehole up to 30 metres plus PLN 250 for each additional metre (the rate depends on the diameter), i.e. PLN 9,000 + 10 × PLN 250. The price covers drilling, installation of well pipes certified for drinking water, and pumping and cleaning the well. You do not pay for the casing, because we pull it out of the ground once the borehole is finished.
Cost of well equipment
A submersible pump suitable for a 40-metre well costs PLN 2,500-4,000, depending on its hydraulic output and lift height. For this depth you need a pump with a lift height of at least 50-55 metres (40 m of depth + 10-15 m working pressure + hydraulic losses in the pipework).
A pressure tank (hydrophore) with a capacity of 100-150 litres costs PLN 750-1,400, a 4×2.5 mm power cable 45 metres long PLN 360-540, and a PE32 discharge pipe 32 mm in diameter and 45 metres long PLN 270-405. A wellhead with a cable gland costs PLN 280-420, and an electrical connection with protection devices PLN 800-1,500.
Total cost of a deep well
A complete 40-metre deep well with full hydraulic and electrical equipment costs PLN 16,460-19,765. The average price for typical geological conditions in Poland is PLN 18,100 including the submersible pump and all accessories.
Total cost calculation for drilling:
| Item | Cost range |
| Borehole with casing and well screen | PLN 11,500 |
| Submersible pump with accessories | PLN 2,500-4,000 |
| Hydraulic and electrical equipment | PLN 2,460-4,265 |
| Total cost | PLN 16,460-19,765 |
40 m deep well
Why use our deep well drilling services?
Top-quality water
The aquifer passes through several filtering layers, which cleans the water effectively.
Lower costs
No more bills for the cubic metres of water you use.
Installation safety
A guaranteed water supply tailored to your needs.
Financial profitability of a 40 m deep well
Return on investment analysis for a 40-metre well
A 40 m deep well pays for itself after 9-17 years of use, with average water consumption of 150 cubic metres a year for a typical 4-person household. With higher water consumption (watering the garden, a swimming pool, a hot tub) the payback period becomes noticeably shorter.
Detailed profitability analysis of a 40 m deep well:
| Item | Cost / value |
| Initial cost of a 40 m well | PLN 18,100 (average) |
| Annual cost of mains water | PLN 1,800-2,400 |
| Annual running cost of the well | PLN 400-750 |
| Net annual savings | PLN 1,050-2,000 |
| Payback period | 9-17 years |
Technical characteristics of a 40 m well
Hydraulic parameters and yield
A 40 m deep well achieves a hydraulic yield of 1,500-4,000 litres per hour, depending on the local hydrogeological conditions of the site. The static water level is usually found at a depth of 20-30 metres below ground level.
Detailed technical characteristics of a 40 m well:
Total borehole depth is 40 metres
Nominal borehole diameter: 150-200 millimetres
Casing diameter: PVC, 125 millimetres
Length of the screen section: 6-9 metres
Operating yield: 1.5-4.0 cubic metres per hour
Detailed pump parameters for the well
A 4-inch submersible pump with an output of 1.5-3.0 cubic metres per hour and a lift height of 50-55 metres is the optimal solution for a 40-metre well. The electrical power of the pump should be 0.75-1.1 kilowatts at a supply voltage of 230 volts. The nominal diameter is 4 inches (100 millimetres), and the purchase cost is PLN 2,500-4,000.
Free quote for a 40 m deep well
Fill in our deep well quote form, or contact us by email or phone.
Water quality in a 40 m deep well
Physical and chemical parameters of water from a depth of 40 m
Water drawn from a 40-metre well is of high microbiological quality thanks to natural filtration through successive geological layers. Total water hardness averages 10-16 degrees German hardness, and the pH is in the range 6.9-7.6.
Typical physical and chemical parameters of water from a 40 m well:
| Parameter | Value range | Standard | Status |
|---|---|---|---|
| Total hardness | 10-16°dH | no standard | hard |
| pH | 6.9-7.6 | 6.5-9.5 | within the standard |
| Iron | 1.5-6.0 mg/l | 0.2 mg/l | above the standard |
| Manganese | 0.08-0.5 mg/l | 0.05 mg/l | above the standard |
| Pathogenic bacteria | absent | absent | within the standard |
| Nitrates | <10 mg/l | 50 mg/l | within the standard |
Water treatment systems for a 40 m well
An iron and manganese removal system is the water treatment system most often required for water drawn from 40-metre wells. The cost of a complete system is PLN 4,000-8,500 for a capacity suited to supplying a household.
Ion-exchange water softeners that reduce water hardness are also available for PLN 3,200-6,000, as are UV disinfection lamps that eliminate bacteria and viruses for PLN 800-1,500.
Permits for a 40 m deep well
What permits are required to drill a well?
Under the Water Law Act (Prawo wodne) (Articles 33 and 395), constructing a water intake up to 30 m deep for ordinary water use and abstracting on average no more than 5 m³ per day for your own household or farm are exempt from a water-law permit and a water-law notification. A 40 m deep well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling.
These are separate conditions: one concerns constructing the intake, the other abstracting the water. A deeper borehole, or using water beyond ordinary use, requires checking the applicable procedure with Wody Polskie.
Formalities for a 40 m well
Because the borehole is deeper than 30 m, the applicable procedure and required documents must be checked with Wody Polskie before work starts. Siting requirements, source protection rules and geological regulations also apply, so before drilling we check the well location and the minimum distances listed below.
Minimum distances of a 40 m well from other structures
The required distances of a 40-metre well from various structures on the plot, in accordance with the Minister of Health regulation on the quality of water intended for human consumption:
| Structure / boundary | Minimum distance from the well |
| Neighbouring plot boundary | 5 m |
| Residential and farm buildings | 15 m |
| Liquid waste tanks | 30 m |
| Domestic sewage treatment plants | 50 m |
| Sealed septic tanks and absorption trenches | 70 m |
The well-building process step by step
Stage one: geological surveys and siting
Geophysical surveys using electrical resistivity tomography before drilling a well cost PLN 1,800-2,500 for a 400-metre profile and make it possible to determine the best location for the well and its expected hydraulic yield with 90-95% accuracy. An alternative is an analysis of PIG hydrogeological maps (Polish Geological Institute) for PLN 300-600, or free observation of indicator vegetation.
Stage two: drilling the 40-metre borehole
Drilling a deep well takes 8-13 working hours in standard ground conditions in Poland. A truck-mounted drilling rig with 150-200 HP drills a borehole 150-200 millimetres in diameter at an average rate of 3-5 metres per hour. The complete process includes preparing the drilling site in 1 hour, the drilling itself in 8-13 hours, installing the casing string over 1.5-2.5 hours and cleaning the well with pumps, which takes 1-2 hours.
Stage three: installing the electrical equipment
Installing a submersible pump in a 40 m well requires a YKYY 4×2.5 mm cable 45 metres long (40 m of depth + 5 m technical reserve). The pump is placed below the dynamic water level (the depth is set after the pumping test). Installing the pump system includes installing the pump at the set depth, running the power cables through a sealed wellhead, installing a pressure tank (hydrophore) in the building or in the water meter chamber, and connecting to the home water supply system.
Maintenance and running a 40 m well
Inspection schedule for a 40-metre well
A technical inspection of a 40 m well should be carried out every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 200-400, including consumables.
Maintaining a 40 m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, testing the water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.
Annual running costs of a well 40 metres deep
Running a 40-metre well costs PLN 400-750 a year for a standard 4-person household using 150 cubic metres of water, and the pump uses 1.2-1.8 kilowatt-hours of electricity per cubic metre of water produced.
The annual running costs of a 40 m well consist of electricity for the pump at PLN 200-350, maintenance and technical inspections at PLN 150-250 and minor repairs and replacement of parts at PLN 50-150, which gives a total annual cost of PLN 400-750.
Book a well drilling date
We build deep wells in every type of ground! Deep well drilling has been our passion since 2019! Get in touch and find out the cost of building a deep well!
Comparing a 40 m deep well with other depths
Comparison with 15 m and 30 m depths
| Depth | Construction cost (borehole) | Water-law permit | Yield | Payback period |
| 15 metres | PLN 9,000 | Not required | 1,200-3,500 L/h | 7-13 years |
| 30 metres | PLN 9,000 | Not required | 1,500-4,000 L/h | 8-15 years |
| 40 metres | PLN 11,500 | To be checked with Wody Polskie | 1,500-4,000 L/h | 9-17 years |
Maintenance and running a 40 m well
Inspection schedule for a 40-metre well
A technical inspection of a 40 m well should be carried out every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 200-400, including consumables.
Maintaining a 40 m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, testing the water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.
Annual running costs of a 40-metre deep well
Running a 40 m well costs PLN 400-750 a year for a standard 4-person household using 150 cubic metres of water. The pump uses 1.2-1.8 kilowatt-hours of electricity per cubic metre of water produced.
The annual running costs of a 40 m well consist of electricity for the pump at PLN 200-350 (150 m³ × PLN 1.3-2.3/m³), maintenance and technical inspections at PLN 150-250, and minor repairs and replacement of parts at PLN 50-150, which gives a total annual cost of PLN 400-750.
What does the well drilling price include?
The overall price for drilling a deep well is calculated according to the rate – per metre of borehole – and depends on the depth of the hole to be drilled.
The cost of such a well depends on several parameters. Remember that the cost may also vary with the location where the deep well drilling takes place.
When drilling a well, the price is affected by:
- the depth of the drilled well
- the diameter of the well casing
- the type of slotted well screen
When installing and equipping the well, the price is affected by:
– the type of well enclosure
– the type of submersible pump
– the type of pumping set installation
– the size of the pressure tank (hydrophore)
– the type of wellhead
– the number of concrete rings
– the type of pump, pressure tank and pressure switch
– the length of the pipeline bringing water to the house
– the depth of the trench, the pressure line trench and the power supply
In most cases the company can only give a price for the service after talking to the customer. A borehole up to 30 metres costs PLN 9,000 net, and each additional metre PLN 250 net (depending on the diameter).
Bear in mind that the cost of drilling a well sometimes includes the cost of the pipes. It is therefore worth checking whether this is the reason for an inflated price. A higher price should be justified: as we mentioned above, the cause is often simply the need to drill a wider hole or to use a more expensive drilling method because of the geological conditions.
Under the ARCHE price list, drilling a 40 m deep well costs PLN 11,500 net. On top of the borehole you need to budget for a submersible pump with fittings and its installation (PLN 700 net + materials under the ARCHE price list).
|
Service name (borehole): |
Price from (net): |
|
Deep well 110Φ |
PLN 250 per metre * |
|
Deep well 125Φ |
PLN 250 per metre * |
40 m deep well

Well for your home
Drilling a deep well is currently the best way to get free, clean water in your home.

Well for businesses
Wells for industry and commerce are a fairly popular solution, especially for car washes, swimming pools, thermal baths, spas and agritourism businesses.

Well for agriculture
Industrial pumps that can move hundreds of metres of water per hour.
How do we drill a well?
Step by step to your deep well in Katowice

1. Free quote
We discuss the borehole, the location and the way it will be carried out

2. Choosing the pump
Choosing the pump and accessories

3. Choosing the location
We decide where on your plot the water will be drawn

4. Drilling the well
The well is drilled on the date you choose.
Book a date for drilling your well
We drill with specialist equipment, the Rotomax XL GT.
With us you get a guarantee of quality.
Reviews
Find an answer
Answers to the questions our customers ask most often
A complete 40 m deep well costs PLN 16,460-19,765, including drilling at PLN 11,500 net (see price list), depending on the geological conditions of the site and the technical equipment chosen.
A 40 metre well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling. The exemption from a water-law permit and notification covers constructing an intake up to 30 m deep for ordinary water use.
A 4-inch submersible pump with an output of 1.5-3.0 cubic metres per hour and a lift height of 50-55 metres of water column. The pump power should be 0.75-1.1 kilowatts. The purchase cost of a submersible pump is PLN 2,500-4,000.
A 40 m well pays for itself after 9-17 years of use with average water consumption of 150 cubic metres a year. A household saves PLN 1,050-2,000 a year compared with the cost of mains water.
A 40 m deep well produces 1,500-4,000 litres per hour, depending on local hydrogeological conditions. That is equivalent to 36-96 cubic metres a day, enough for any household.
Drilling a 40 m well takes 1-2 working days. The rotary drilling itself takes 8-13 hours, and the complete installation with the electrical equipment takes 2-3 working days.
The water is drinkable, but it may need treatment. It often contains excess iron (1.5-6.0 mg/l against a limit of 0.2 mg/l) and is characterised by hardness (10-16 °dH). An iron removal system costs PLN 4,000-8,500.
The minimum required distances are 5 metres from the plot boundary, 15 metres from residential buildings, 30 metres from liquid waste tanks and 50 metres from domestic wastewater treatment plants.
The annual running cost is PLN 400-750 and covers electricity for the pump (PLN 200-350), technical maintenance (PLN 150-250) and minor repairs (PLN 50-150).
Well drilling is possible all year round. In winter work may take a little longer because of the frozen surface layer of ground, but modern drilling equipment copes well with difficult weather conditions.
Check the condition of the pump and the well screens. Flushing the well with pumps often helps.
The water is of high microbiological quality thanks to natural geological filtration. Typical parameters for this water are hardness of 10-16°dH, pH 6.9-7.6 and iron 1.5-6.0 mg/l. It usually requires an iron removal system to be installed.
How much does a deep well cost? Write to us or call
Drilling tips
Read the most important posts on our blog. Gather the knowledge you need before choosing the best option for you.
See the towns where we drill every day!