30m deep well

A 30 metre deep well is a borehole reaching a depth of exactly 30 metres, as defined by the Polish Geological Institute in its “Analysis of Poland’s Groundwater Resources” (2024). Also described as the maximum well without a permit or a water intake at the legal threshold, a 30m deep well gives access to stable aquifers while keeping legal formalities simple under the Water Law Act (Prawo wodne).

A 30 metre deep well is an ideal compromise between investment cost and hydraulic performance for owners of detached houses in Poland. According to the latest market data from 2026, the total cost of building a 30 metre well is PLN 13,520-17,855, and the investment pays for itself on average after 8-15 years compared with the cost of drawing water from the municipal mains.

Compare information for other depths: 20 m well, 40 m well. The borehole depth is chosen to suit the conditions on the plot.

Studnia Głębinowa 30m

How much does a 30 metre deep well cost in 2026

Cost of a 30 metre borehole

At ARCHE, drilling a 30 m deep well costs PLN 9,000 net under the 2026 price list (a fixed price for a borehole up to 30 metres). The price covers drilling, installation of well pipes certified for drinking water, and pumping and cleaning the well. You do not pay for the casing, because we pull it out of the ground once the borehole is finished.

Cost of equipping the well

A submersible pump suitable for a 30 metre well costs PLN 2,200-4,800 depending on its hydraulic capacity and lifting head. For this depth you need a pump with a head of at least 40-45 metres (30m of depth + 10-15m of working pressure + hydraulic losses in the pipeline).

A pressure tank (hydrophore) with a capacity of 100-150 litres costs PLN 750-1,400, a 4×2.5mm power cable 35 metres long PLN 280-420, and a 32mm diameter PE32 discharge pipe 35 metres long PLN 210-315. A wellhead with a cable gland costs PLN 280-420, and an electrical connection with protection devices PLN 800-1,500.

Total cost of a deep well

A complete 30 metre deep well with full hydraulic and electrical equipment costs PLN 13,520-17,855 in 2026. The average price for typical geological conditions in Poland is PLN 15,700, including a submersible pump and all accessories.

Total cost calculation for a 30m well:

ItemCost range
Borehole with casing and well screenPLN 9,000
Submersible pump with accessoriesPLN 2,200-4,800
Hydraulic and electrical equipmentPLN 2,320-4,055
Total costPLN 13,520-17,855
Studnia głębinowa 90m

30 metre deep well

Why use our deep well drilling services?

Studnia Głębinowa Odwierty Śląsk

Top-quality water

The aquifer passes through several filtering layers, which cleans the water effectively.

Studnia głębinowa 90m

Lower costs

No more bills for the cubic metres of water you use.

Wiercenie Studni w Częstochowa

Installation safety

A guaranteed water supply tailored to your needs.

Profitability of a 30m deep well

Return on investment analysis for a 30m well

A 30m deep well pays for itself after 8-15 years of use at an average water consumption of 150 cubic metres per year for a typical 4-person household. With higher water use (watering the garden, a swimming pool, a hot tub), the payback period becomes noticeably shorter.

Detailed profitability analysis of a 30 m well:

ItemCost / value
Initial cost of a 30 m wellPLN 15,700 (average)
Annual cost of mains waterPLN 1,800-2,400
Annual running cost of the wellPLN 400-750
Annual net savingsPLN 1,050-2,000
Payback period8-15 years

When is drilling a 30 metre well worth it?

A 30 metre deep well is definitely a worthwhile investment in the following cases:

A 30 metre deep well is definitely a worthwhile investment where there is no access to the mains water network and the cost of a connection exceeds PLN 15,000, where water use is high at over 200 cubic metres per year, where intensive garden watering needs an extra 100-300 cubic metres per year, and where building a mains connection is costly because the plot is more than 100 metres from the network.

A 30m well is also worth considering with average water use of 100-200 cubic metres per year, mains access 50-100 metres from the plot, and planned growth in water use because of a swimming pool or an expanded garden.

Cost comparison: 30 metre well vs municipal mains water

30m well vs municipal mains water. A detailed financial analysis over 10 years of use:

Comparison criterion30m wellMunicipal mains water
Initial costPLN 15,700PLN 8,000-20,000*
Annual running costPLN 400-750PLN 2,000
Total 10-year costPLN 19,700-23,200PLN 28,000-40,000
Independence from the supplierFull autonomyNo independence
Water qualityNatural mineralisationChlorinated and fluoridated
Availability during failuresContinuousSupply interruptions

*the cost of a mains water connection depends on the distance to the network

costs well 30m vs mains

Technical specification of a 30m well

Hydraulic and performance parameters

A 30 metre deep well achieves a hydraulic yield of 1,500-4,000 litres per hour, depending on the local hydrogeological conditions of the site. The static water level is usually at a depth of 8-15 metres below ground level.

Detailed technical specification of a 30m well:

  • Total borehole depth: 30.0 metres
  • Nominal borehole diameter: 150-200 millimetres
  • Casing diameter: 125 millimetre PVC
  • Length of the screen zone: 6-9 metres
  • Operating yield: 1.5-4.0 cubic metres per hour
  • Static water level: 8-15 metres below the surface

Detailed pump parameters for a 30m well

A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a head of 45-50 metres is the optimal solution for a 30 metre well. The electrical power of the pump should be 1.1-1.5 kilowatts at a supply voltage of 230 volts. The nominal diameter is 4 inches (100 millimetres), and the purchase cost is PLN 2,200-4,800.

Studnia Głębinowa

Free quote for a 30m deep well

Fill in our deep well quote form, or contact us by email or phone.

Water quality from a 30m deep well

Physical and chemical parameters of water from a depth of 30m

Water drawn from a 30 metre well has high microbiological quality thanks to natural filtration through successive geological layers. Total water hardness averages 10-16 German degrees, and the pH is in the range of 6.9-7.6.

Typical physical and chemical parameters of water from a 30m well:

Parameter Range of values Standard Status
Total hardness 10-16°dH no limit hard
pH 6.9-7.6 6.5-9.5 within limits
Iron 1.5-6.0 mg/l 0.2 mg/l above limit
Manganese 0.08-0.5 mg/l 0.05 mg/l above limit
Pathogenic bacteria absent absent within limits
Nitrates <10 mg/l 50 mg/l within limits

Water treatment systems for water from a 30m well

An iron and manganese removal system is the water treatment system most often required for water drawn from 30 metre wells. A complete system costs PLN 4,000-8,500 for a capacity suited to supplying a household.

Ion-exchange water softeners are also available for PLN 3,200-6,000 to reduce water hardness, as well as UV disinfection lamps for PLN 800-1,500 that eliminate bacteria and viruses.

Permits for a 30m deep well

Does a 30m well need a water-law permit?

A 30 m deep well does not require a water-law permit or a water-law notification if it is used for ordinary water use. Under the Water Law Act (Prawo wodne) (Articles 33 and 395), constructing a water intake up to 30 m deep for ordinary water use and abstracting on average no more than 5 m³ per day for your own household or farm are exempt from a water-law permit and a water-law notification.

These are separate conditions: one concerns constructing the intake, the other abstracting the water. A deeper borehole, or using water beyond ordinary use, requires checking the applicable procedure with Wody Polskie.

Formalities for a 30 m well

For ordinary water use a 30 m well needs neither a water-law permit nor a water-law notification, both of which are handled by Wody Polskie. However, the exemption does not lift siting requirements, source protection rules or geological regulations, so before drilling we check the well location and the minimum distances listed below.

Minimum distances of a 30m well from other structures

Required distances of a 30 metre well from various objects on the plot, in line with the Minister of Health regulation on the quality of water intended for human consumption:

Object / boundaryMinimum distance from the well
Boundary of a neighbouring plot5 m
Residential and farm buildings15 m
Liquid waste tanks30 m
Domestic wastewater treatment plants50 m
Sealed septic tanks and soakaway trenches70 m

The 30m well construction process step by step

Stage one: geological survey and siting

Geophysical surveys using electrical resistivity tomography before building a 30m well cost PLN 2,800-4,500 for a 400 metre profile and make it possible to determine the best location for the well and the expected hydraulic yield with an accuracy of 90-95 percent. An alternative is an analysis of PIG hydrogeological maps for PLN 300-600, or free observation of indicator vegetation.

Stage two: drilling the 30 metre borehole

Drilling a 30m deep well takes 6-10 working hours in standard ground conditions in Poland. A truck-mounted drilling rig with a power of 150-200 HP drills a borehole 150-200 millimetres in diameter at an average speed of 3-5 metres per hour.

The complete process includes preparing the drilling site in 1 hour, the drilling itself of the 30 metre borehole in 6-10 hours, installing the casing string over 2-3 hours, and cleaning the well with pumps, which takes 1-2 hours.

Stage three: installing the electrical equipment

Installing a submersible pump in a 30m well requires a YKYY 4×2.5mm cable 35 metres long (30m of depth + 5m of technical reserve). The pump is placed at a working depth of 25-28 metres below ground level.

Installing the pumping system includes placing the pump at a depth of 25-28 metres, routing the power cables through the sealed wellhead, installing the pressure tank (hydrophore) in the building or in the water meter chamber, and connecting to the home’s water supply system.

Maintenance and operation of a 30m well

Inspection schedule for a 30 metre well

A technical inspection of a 30m well should take place every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 200-400, including consumables.

Maintaining a 30m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, testing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.

Annual running costs of a 30m well

Running a 30m well costs PLN 400-750 per year for a standard 4-person household using 150 cubic metres of water. The pump’s electricity consumption is 1.2-1.8 kilowatt hours per cubic metre of water produced.

The annual running costs of a 30m well consist of electricity for the pump at PLN 200-350 (150m³ × PLN 1.3-2.3/m³), maintenance and technical inspections at PLN 150-250, and minor repairs and replacement of parts at PLN 50-150, giving a total annual cost of PLN 400-750.

Wiercenie - Studnia Głębinowa Arche S.C.
Studnia Głębinowa

Book a well drilling date

We build deep wells in every type of ground! Deep well drilling has been our passion since 2019! Get in touch and find out the cost of building a deep well!

Comparing a 30m well with other depths

Comparative analysis with depths of 25m and 35m

Depth Construction cost (borehole) Water-law permit Yield Return on investment
25 metres PLN 9,000 Not required 1,200-3,500 L/h 8-15 years
30 metres PLN 9,000 Not required 1,500-4,000 L/h 8-15 years
35 metres PLN 10,250 To be checked with Wody Polskie 1,800-4,500 L/h 8-16 years

A 30 metre deep well offers the best ratio of price to yield while still not needing a water-law permit.

Why choose a depth of exactly 30 metres

A deep well of exactly 30 metres is a strategic investment choice because it gives optimal hydraulic yield for households, access to stable high-quality aquifers, moderate annual running costs and no need for a water-law permit or notification for ordinary water use.

Maintenance and operation of a 30m well

Inspection schedule for a 30 metre well

A technical inspection of a 30m well should take place every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 200-400, including consumables.

Maintaining a 30m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, testing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.

Annual running costs of a 30m well

Running a 30m well costs PLN 400-750 per year for a standard 4-person household using 150 cubic metres of water. The pump’s electricity consumption is 1.2-1.8 kilowatt hours per cubic metre of water produced.

The annual running costs of a 30m well consist of electricity for the pump at PLN 200-350 (150m³ × PLN 1.3-2.3/m³), maintenance and technical inspections at PLN 150-250, and minor repairs and replacement of parts at PLN 50-150, giving a total annual cost of PLN 400-750.

What does the well drilling price include?

The overall price for drilling a deep well is calculated according to the rate – per metre of borehole – and depends on the depth of the hole to be drilled.

The cost of such a well depends on several parameters. Remember that the cost may also vary with the location where the deep well drilling takes place.

When drilling a well, the price is affected by:

  • the depth of the drilled well
  • the diameter of the well casing
  • the type of slotted well screen

When installing and equipping the well, the price is affected by:

– the type of well enclosure
– the type of submersible pump
– the type of pumping set installation
– the size of the pressure tank (hydrophore)
– the type of wellhead
– the number of concrete rings
– the type of pump, pressure tank and pressure switch
– the length of the pipeline bringing water to the house
– the depth of the trench, the pressure line trench and the power supply

In most cases the company can only give a price for the service after talking to the customer. A borehole up to 30 metres costs PLN 9,000 net, and each additional metre PLN 250 net (depending on the diameter).

Please remember that the cost of drilling a well sometimes includes the cost of the pipes. It is therefore worth checking whether this is the reason for an inflated price. A higher price should be justified: as we mentioned above, the cause is often simply the need to drill a wider borehole or to use a more expensive drilling method because of the geological conditions.

Under the ARCHE price list, drilling a 30 m deep well costs PLN 9,000 net. On top of the borehole you need to budget for a submersible pump with fittings and its installation (PLN 700 net + materials under the ARCHE price list).

Service name (borehole):

Price from (net):

Deep well  110Φ

PLN 250 per metre *

Deep well  125Φ

PLN 250 per metre *

Deep well 30 metres

Ikona Dom

Well for your home

Drilling a deep well is currently the best way to get free, clean water in your home.

Ikona Firma

Well for businesses

Wells for industry and commerce are a fairly popular solution, especially for car washes, swimming pools, thermal baths, spas and agritourism businesses.

Ikona Gospodarstwo

Well for agriculture

Industrial pumps that can move hundreds of metres of water per hour.

How do we drill a well?

Step by step to your deep well in Katowice

1 krok budowy studni głębinowej

1. Free quote

We discuss the borehole, the location and the way it will be carried out

2 krok budowy studni głębinowej

2. Choosing the pump

Choosing the pump and accessories

3 krok budowy studni głębinowej

3. Choosing the location

We decide where on your plot the water will be drawn

4 krok budowy studni głębinowej

4. Drilling the well

The well is drilled on the date you choose.

Book a date for drilling your well

We drill with specialist equipment, the Rotomax XL GT.
With us you get a guarantee of quality.

Reviews

See our projects

Find an answer

Answers to the questions our customers ask most often – Deep well 30 metres

A complete 30 m deep well costs PLN 13,520-17,855 (including drilling at PLN 9,000 net under the ARCHE price list), depending on the geological conditions of the site and the technical equipment you choose.

A well exactly 30 metres deep does NOT need a water-law permit. Constructing an intake up to 30 m deep for ordinary water use and abstracting on average up to 5 m³ per day for your own household are exempt from a water-law permit and a water-law notification.

A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a lift of 45-50 metres of water column. The pump power should be 1.1-1.5 kW. A submersible pump costs PLN 2,200-4,800.

A 30 m well pays for itself after 8-15 years of use at an average water consumption of 150 cubic metres per year. A household saves PLN 1,050-2,000 per year compared with the cost of mains water.

A 30 m deep well produces 1,500-4,000 litres per hour, depending on the local hydrogeological conditions. That equals 36-96 cubic metres per day, which is enough for any household.

Drilling a 30 m well takes 1-2 working days. The rotary drilling itself takes 6-10 hours, and the complete installation with the electrical equipment takes 1-2 working days.

The water is drinkable, but it may need treatment. It often contains too much iron (1.5-6.0 mg/l against a limit of 0.2 mg/l) and is hard (10-16°dH). An iron removal system costs PLN 4,000-8,500.

The required minimum distances are 5 metres from the plot boundary, 15 metres from residential buildings, 30 metres from liquid waste tanks and 50 metres from domestic wastewater treatment plants.

The annual running cost is PLN 400-750 and covers electricity for the pump (PLN 200-350), technical maintenance (PLN 150-250) and minor repairs (PLN 50-150).

A well can be drilled all year round. In winter the work may take slightly longer because of the frozen surface layer of the ground, but modern drilling equipment copes well with difficult weather conditions.

Check the technical condition of the pump and the well screens. Flushing the well with pumps often helps.

The water is of high microbiological quality thanks to natural geological filtration. Typical parameters for this water are hardness 10-16°dH, pH 6.9-7.6 and iron 1.5-6.0 mg/l. It usually needs an iron removal system.

How much does a deep well cost? Write to us or call

ARCHE S.C logo

Check out our YouTube channel and Facebook:

See the towns where we drill every day!

Free quote form

We call back within 24 hours

OFERTEO