Construction and equipment

Well drilling rig: manual, rented or a drilling company?

Mateusz Skotnicki , updated 6 min read

Wiertnica do studni. Ręczna, z wypożyczalni czy firma?

A well drilling rig is the equipment that drills a hole down to the aquifer. For a shallow well in sand, a hand auger or a small rig from an equipment hire shop is enough, hired for anything from a few dozen to a few hundred zloty. A deep well of several dozen metres, in clay or rock, needs a professional rig with a set of casing pipes and a compressor or drilling fluid system. This kind of equipment is not hired out to amateur operators, which is why the drilling is commissioned from a company.

Types of well drilling rigs

Types of well drilling rigs and their approximate depth range: hand auger, small rig, professional rig
The reach depends on the ground. In clay and rock, amateur equipment runs out sooner.
Equipment Typical use Limitations
Hand auger Shallow holes in sand, driven well (Abyssinian well), ground probing Stops at clay, stones and at the water table in running sand
Small motorised rig (petrol or electric) Holes of a dozen or so metres in favourable ground, garden No large-diameter casing, difficult to install the screen and gravel pack
Professional rig (rotary with drilling fluid, percussion, pneumatic) Deep wells of several dozen metres and more, including in rock Requires a trained crew, access and space on the plot

The reach depends on the ground more than on the machine itself. In clean sand small equipment goes further, but in clay, gravel with stones and rock it stops quickly. We describe how this looks in practice in our article on drilling a well yourself.

Hiring a well drilling rig: how much does it cost

Hire prices depend on the hire shop and the type of equipment. In 2026 listings you can find, for example:

  • a hand drilling set for about PLN 50 per day,
  • a small petrol-powered rig for about PLN 50 per day,
  • a rig for holes up to about 10 m, with a drill bit and sludge bailers, for about PLN 150 per week.

These are indicative amounts from listings, not a market price list. On top of the hire, add the well pipes, the screen, gravel for the gravel pack, transport of the equipment and your own time. Also ask whether the hire shop gives instruction and what happens if the drill bit gets stuck in the hole.

What a hired rig will not do

Drilling the hole is only half the job. Whether the well gives clean water for years is decided by how it is constructed:

  • casing pipes that hold up the walls of the hole during drilling, especially in running sand,
  • a well screen with a slot size matched to the ground,
  • a gravel pack around the screen,
  • a seal that shuts out surface water,
  • pumping out and a pumping test, which shows the yield.

Amateur equipment usually does not allow this to be done properly at greater depth. The result can be sand in the water, low yield or a collapsed hole. We write about sand and running ground in our article on running sand in a well. The successive stages of construction are shown in building a well step by step.

When a hand rig is enough

A hand rig or a small rig makes sense when:

  • the water is shallow and the ground is sandy,
  • you need water only for watering,
  • you accept that the well may dry up in a drought.

In such conditions an even simpler driven well is often enough, which is driven in rather than drilled.

Professional rig: how a drilling company works

The company arrives with a truck-mounted rig, a stock of casing and well pipes, and a compressor or drilling fluid system. At ARCHE we work with a Rotomax XL GT rig and an Atlas Copco XRVS compressor, using the percussion method. We drill more than 200 wells a year.

The price of the borehole includes the gravel pack, installation of the well pipes, a pumping test and a 2-year warranty. We pull out the casing pipes after installation, so they do not stay in the ground.

Cost comparison

Option What you pay What to watch out for
Hiring a rig Hire, materials, transport, time Risk of the equipment getting stuck, no warranty, limited depth
Drilling company (ARCHE) PLN 9000 net for a borehole up to 30 m, PLN 250 net for each further metre Connection and pump separately, according to the price list

You will find the full rates in the deep well price list, and we discuss the differences between companies’ quotes in our article on the cost of drilling a well per metre.

Formalities

The formalities are decided by the depth and the purpose of the abstraction, not by the type of rig. Constructing a water source up to 30 m for ordinary use of water, and abstraction not exceeding 5 m³ per day on annual average for the needs of one’s own household or farm, are exempt from a water-law permit and notification (Art. 33 and Art. 395 of the Water Law Act (Prawo wodne)). These are separate conditions concerning the construction of the water source and the abstraction of water. A deeper borehole, or use of the water beyond ordinary use, requires checking the right procedure with Wody Polskie. The exemption does not remove location requirements, the protection of water sources or the geological regulations.

Frequently asked questions

How much does it cost to hire a well drilling rig?

In 2026 listings, simple hand drilling sets and small petrol-powered rigs cost about PLN 50 per day, and a rig for holes of about 10 m costs about PLN 150 per week. Materials and transport come on top.

How deep can you drill a well with a hand rig?

In sand, usually a few to a dozen or so metres. In clay, gravel with stones and rock, hand equipment stops much sooner.

Can I make a deep well with a hired rig?

Usually not. A deep well requires drilling to several dozen metres, casing pipes, a screen and a gravel pack, which means the equipment and experience of a drilling company.

Do you need a licence to drill a well?

Not for drilling a shallow hole for your own needs. For deeper water sources and abstraction beyond ordinary use of water, you need to check the procedure with Wody Polskie and the geological regulations.

Which is better: a drilling rig or a driven well?

For shallow water in sand and a need for watering, a driven well is simpler and cheaper. If the water is to supply a house, a deep well made by a company is better.

Sources

Is your ground too hard for a hired rig, or do you need water for a house? Order a borehole quote or call: +48 784 038 407.

Article author: Mateusz Skotnicki

Author

Mateusz Skotnicki

Deep well drilling expert

I am Mateusz Skotnicki, an enthusiast and specialist in deep well drilling. Welcome to a world where water is not only an essential part of life but also an endless source of inspiration.

Further reading

Next article in this topicPressure tank for a deep well: diaphragm tank, pressure switch and pressure

Contact

Planning a deep well?

Tell us about your plot and your needs, and we will prepare a free quote for the drilling. Already have a well? We can help with servicing, the pump and water treatment.