Regulations and formalities

Formalities: drilling a well and abstracting water

The formalities depend on the depth, the amount of water abstracted and the purpose it is used for. Constructing the water intake and the abstraction that follows are two separate matters.

When the water-law exemption applies

Constructing a water intake down to 30 m for ordinary use of water, and abstraction averaging no more than 5 m³ per day over the year for the needs of your own household or farm, are exempt from a water-law permit and notification. The basis is Articles 33 and 395 of the Water Law Act (Prawo wodne). The conditions apply separately to constructing the intake and to abstraction.

A deeper borehole, or using water beyond ordinary use, requires checking the correct procedure with Wody Polskie. The water-law exemption does not remove location requirements, protection of water intakes or separate geological regulations.

Prepare a description of your situation

  • The address, plot number, cadastral district and information on your right to the property.
  • The planned depth of the intake and whether the well already exists.
  • The purpose of use: your own home, your own farm or another activity.
  • The expected abstraction, its seasonal pattern and how it was determined.
  • A location map and a description of the planned works.

With this set it is easier to get an answer about your specific project. The general question "does a well require notification" usually overlooks the conditions that decide the procedure.

What needs to be checked separately

Do not automatically carry over the rules for a private home to a business, a rental property, supplying water to other people or a shared intake. Changing the use of an existing well may change how your obligations are assessed.

Before drilling, also check the planning and geological requirements with the relevant offices. We do not assume that every well has to be notified to the district office (starostwo), or that a depth of up to 30 m alone settles all the formalities.

Keep the replies and documents

Archive correspondence with the authority, submitted documents, confirmations and decisions. In the project record, write down any conditions that must be met or checked. Our owner forms are only aids; download official forms from the current website of the relevant institution.

Sources:

Checked 8 October 2026

Read and plan further

Next guideWell location and required distances

Contact

Need help with your well?

Describe your needs or the symptoms. You can add the planner summary, test results and photos of the installation.

Other guides in this section

Free quote form

We call back within 24 hours

OFERTEO