Deep well 90m

A 90 metre deep well is an ideal compromise between investment cost and hydraulic yield for owners of detached houses in Poland. According to the latest market data from 2026, the total cost of building a 90-metre well is PLN 32,110-37,115, and the investment pays for itself on average after 19-38 years compared with the cost of drawing water from the municipal mains network.

Compare information for other depths: 80 m well, 100 m well. The borehole depth is chosen to suit the conditions on your plot.

Studnia głębinowa 90m

How much does a 90m deep well cost in 2026

Cost of a borehole to a depth of 90 metres

At ARCHE, drilling a 90 m deep well costs PLN 24,000 net under the 2026 price list: PLN 9,000 for a borehole up to 30 metres plus PLN 250 for each additional metre (the rate depends on the diameter), i.e. PLN 9,000 + 60 × PLN 250. The price covers drilling, installation of well pipes certified for drinking water, and pumping and cleaning the well. You do not pay for the casing, because we pull it out of the ground once the borehole is finished.

Cost of well equipment

A submersible pump suitable for a 90 metre well costs PLN 4,500-7,000, depending on hydraulic capacity and lift. For this depth you need a pump with a lift of at least 105-115 metres (90m of depth + 10-15m of operating pressure + hydraulic losses in the pipework). A pressure tank (hydrophore) with a capacity of 150-200 litres costs PLN 1,200-2,200, a power cable with a cross-section of 4×2.5mm and a length of 95 metres costs PLN 760-1,140, and a PE32 discharge pipe with a diameter of 32mm and a length of 95 metres costs PLN 570-855. A wellhead with a cable gland is PLN 280-420, and the electrical connection with protection devices is PLN 800-1,500.

Total cost of a deep well

A complete 90 metre deep well with full hydraulic and electrical equipment costs PLN 32,110-37,115. The average price for typical geological conditions in Poland is PLN 34,600 with a submersible pump and all accessories.

Calculation of total drilling costs:

ItemCost range
Borehole with casing and screenPLN 24,000
Submersible pump with accessoriesPLN 4,500-7,000
Hydraulic and electrical equipmentPLN 3,610-6,115
Total costPLN 32,110-37,115
Studnia głębinowa 90m

Deep well 90m

Why use our deep well drilling services?

Studnia Głębinowa Odwierty Śląsk

Top-quality water

The aquifer passes through several filtering layers, which cleans the water effectively.

Studnia głębinowa 90m

Lower costs

No more bills for the cubic metres of water you use.

Wiercenie Studni w Częstochowa

Installation safety

A guaranteed water supply tailored to your needs.

Financial viability of a 90m deep well

Payback analysis for a 90 metre well

A 90m deep well pays for itself after 19-38 years of use, assuming average water consumption of 150 cubic metres a year for a typical household of four. With higher water use (watering the garden, a swimming pool, a hot tub) the payback period becomes noticeably shorter.

Detailed financial analysis of a 90m deep well:

ItemCost / value
Initial cost of a 90 m wellPLN 34,600 (average)
Annual cost of mains waterPLN 1,800-2,400
Annual running cost of the wellPLN 550-900
Net annual savingsPLN 900-1,850
Payback period19-38 years

When is drilling a 90 metre well worth it?

A 90m deep well is clearly a worthwhile investment where there is no access to the mains water network and the cost of a connection exceeds PLN 25,000, where water consumption is high at over 200 cubic metres a year, where intensive garden watering requires an additional 100-300 cubic metres a year, and where building a water connection is expensive because the property is more than 150 metres from the network.

A 90m well is also worth considering with average water consumption of 150-250 cubic metres a year, with mains water more than 100 metres from the plot, and with planned growth in water use from building a swimming pool or extending the garden.

Cost comparison: 90 metre well vs mains water for a detached house

A 90m deep well versus mains water. Detailed financial analysis over 10 years of use:

Comparison criterion90m wellMains water
Initial costPLN 34,600PLN 8,000-20,000*
Annual running costPLN 550-900PLN 2,000
Total 10-year costPLN 40,100-43,600PLN 28,000-40,000
Independence from the supplierFull autonomyNo independence
Water qualityNatural mineralisationChlorinated and fluoridated
Availability during outagesContinuousSupply interruptions
costs well 90m vs mains

Technical characteristics of a 90m well

Hydraulic parameters and yield

A 90m deep well achieves a hydraulic yield of 2000-5000 litres per hour, depending on local hydrogeological conditions. The static water table is usually found at a depth of 50-70 metres below ground level.

Detailed technical characteristics of a 90m well:

  • Total borehole depth: 90 metres

  • Nominal borehole diameter: 150-200 millimetres

  • Casing diameter: PVC 125 millimetres

  • Length of the screen zone: 9-12 metres

  • Operating yield: 2.0-5.0 cubic metres per hour

Detailed pump parameters for the well

A 4-inch submersible pump with a capacity of 2.0-4.0 cubic metres per hour and a lift of 110-130 metres is the optimal solution for a 90-metre well. The electrical power of the pump should be 2.2-3.0 kilowatts at a supply voltage of 230 volts or 400 volts (three-phase). The nominal diameter is 4 inches (100 millimetres), and the purchase cost is PLN 4,500-7,000.

Studnia Głębinowa

Free quote for a 90 m deep well

Fill in our deep well quote form, or contact us by email or phone.

Water quality in a 90 m deep well

At this depth the water is usually better isolated from surface contamination, but it may have higher mineralisation.


Physicochemical parameters of water from a depth of 90 m

Water drawn from a 90-metre well has excellent microbiological quality thanks to natural filtration through very thick geological layers. The total hardness of the water averages 12-18 German degrees (°dH), and the pH falls in the range of 7.0-7.8 pH units.

Typical physicochemical parameters of water from a 90 m well:

ParameterValue rangeStandardStatus
Total hardness12-18 °dHno standardhard / very hard
pH7.0-7.86.5-9.5within standard
Iron2.0-8.0 mg/l0.2 mg/labove standard
Manganese0.1-0.8 mg/l0.05 mg/labove standard
Pathogenic bacteriaabsentabsentwithin standard
Nitrates<5 mg/l50 mg/lwithin standard (very low)

Water treatment systems for a 90 m well

An iron and manganese removal system is an essential water treatment solution for water drawn from 90-metre wells, due to the higher concentration of minerals at this depth. The cost of a complete system is PLN 5,500-10,500 for a capacity sufficient to supply a household.

Ion-exchange water softeners are also available for PLN 3,500-6,500, which reduce water hardness, as well as UV disinfection lamps for PLN 800-1,500, which eliminate bacteria and viruses (although at 90 metres the risk of bacterial contamination is minimal).

Permits for a 90 m deep well

What permits are required to drill a well?

Under the Water Law Act (Prawo wodne) (Articles 33 and 395), constructing a water intake up to 30 m deep for ordinary water use and abstracting on average no more than 5 m³ per day for your own household or farm are exempt from a water-law permit and a water-law notification. A 90 m deep well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling.

These are separate conditions: one concerns constructing the intake, the other abstracting the water. A deeper borehole, or using water beyond ordinary use, requires checking the applicable procedure with Wody Polskie.

Formalities for a 90 m well

Because the borehole is deeper than 30 m, the applicable procedure and required documents must be checked with Wody Polskie before work starts. Siting requirements, source protection rules and geological regulations also apply, so before drilling we check the well location and the minimum distances listed below.

Minimum distances of a 90 m well from structures

Required distances of a 90-metre well from various features on the plot, in accordance with the Minister of Health regulation on the quality of water intended for human consumption:

Feature / boundaryMinimum distance of the well
Neighbouring plot boundary5 m
Residential and farm buildings15 m
Liquid waste tanks30 m
Domestic wastewater treatment plants50 m
Sealed septic tanks and soakaway pits70 m

The well-building process step by step

Stage one: geological surveys and siting

Geophysical surveys using electrical resistivity tomography before drilling a well cost PLN 2,500-3,500 for a 400-metre profile (a greater measurement depth is required for 90 m) and make it possible to determine the optimal well location and the expected hydraulic yield with 90-95 per cent accuracy. An alternative is an analysis of PIG hydrogeological maps for PLN 300-600 or free observation of indicator vegetation.

Stage two: drilling the 90-metre borehole

Drilling a deep well takes 12-20 working hours in standard ground conditions in Poland. A truck-mounted drilling rig with 150-200 HP drills a borehole 150-200 millimetres in diameter at an average speed of 3-5 metres per hour (the pace slows as the depth and the resistance of the layers increase).

The complete process includes setting up the drilling site in 1 hour, the drilling itself within 12-20 hours, installing the casing string over 4-6 hours and clearing the well with pumps (cleaning pumping) taking 3-5 hours.

Stage three: installing the electrical equipment

Installing a submersible pump in a 90 m well requires a YKYY 4×2.5 mm cable with a length of 95 metres (90 m of depth + 5 m technical reserve). The pump is placed at a working depth of 70-85 metres below ground level (depending on the established water level).

Installing the pump system includes placing the pump at a depth of 70-85 metres, routing the power cables through a sealed wellhead, installing a pressure tank (hydrophore) in the building or in the water meter chamber, and connecting to the domestic plumbing system.

Maintenance and operation of a 90 m well

Inspection schedule for a 90-metre well

A technical inspection of a 90 m well should be carried out every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400 including consumables.

Maintenance of a 90 m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing the water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 10-15 years (equipment of this class used at greater depths is usually sturdier, though more expensive).

Annual operating costs of a well 90 metres deep

Operating a 90-metre well costs PLN 550-900 per year for a standard 4-person household using 150 cubic metres of water. The pump’s electricity consumption is 1.6-2.2 kilowatt-hours per cubic metre of water produced, because a much greater lift height has to be overcome.

The annual operating costs of a 90 m well consist of:

  • Electricity for the pump: PLN 300-500 (150 m³ × PLN 2.0-3.3/m³),

  • Maintenance and technical inspections: PLN 180-250,

  • Minor repairs and replacement of parts: PLN 70-150,

  • Total annual cost: PLN 550-900.

Wiercenie - Studnia Głębinowa Arche S.C.
Studnia Głębinowa

Book a well drilling date

We build deep wells in every type of ground! Deep well drilling has been our passion since 2019! Get in touch and find out the cost of building a deep well!

Comparison of a 90 m deep well with other depths

Comparison with other depths

DepthConstruction cost (borehole)Water-law permitYieldPayback period
15 metresPLN 9,000Not required1,200-3,500 L/h7-13 years
30 metresPLN 9,000Not required1,500-4,000 L/h8-15 years
90 metresPLN 24,000To be checked with Wody Polskie2,000-5,000 L/h19-38 years

A 90 m deep well offers a good price-to-yield ratio.

Why drill to a depth of 90 metres?

A borehole drilled to a depth of 90 metres is worth considering because of its optimal hydraulic yield for households, access to stable, high-quality aquifers and moderate annual operating costs. As it is deeper than 30 m, the applicable procedure must be checked with Wody Polskie before drilling.

Maintenance and operation of a 90 m well

Inspection schedule for a 90-metre well

A technical inspection of a 90 m well should be carried out every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400 including consumables. Maintenance of a 90 m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing the water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 10-15 years.

Annual operating costs of a 90-metre deep well

Operating a 90 m well costs PLN 550-900 per year for a standard 4-person household using 150 cubic metres of water. The pump’s electricity consumption is 1.6-2.2 kilowatt-hours per cubic metre of water produced. The annual operating costs of a 90 m well consist of electricity for the pump at PLN 300-500 (150 m³ × PLN 2.0-3.3/m³), maintenance and technical inspections at PLN 180-250 and minor repairs and replacement of parts at PLN 70-150, giving a total annual cost of PLN 550-900.

What does the well drilling price include?

The overall price for drilling a deep well is calculated according to the rate – per metre of borehole – and depends on the depth of the hole to be drilled.

The cost of such a well depends on several parameters. Remember that the cost may also vary with the location where the deep well drilling takes place.

When drilling a well, the price is affected by:

  • the depth of the drilled well
  • the diameter of the well casing
  • the type of slotted well screen

When installing and equipping the well, the price is affected by:

– the type of well enclosure
– the type of submersible pump
– the type of pumping set installation
– the size of the pressure tank (hydrophore)
– the type of wellhead
– the number of concrete rings
– the type of pump, pressure tank and pressure switch
– the length of the pipeline bringing water to the house
– the depth of the trench, the pressure line trench and the power supply

In most cases the company can only give a price for the service after talking to the customer. A borehole up to 30 metres costs PLN 9,000 net, and each additional metre PLN 250 net (depending on the diameter).

Keep in mind that the cost of drilling a well sometimes includes the cost of the casing. It is therefore worth checking whether this is the reason for an inflated price. A higher price should be justified: as we mentioned above, the reason is often simply the need to drill a wider hole or to use a more expensive drilling method because of the geological conditions.

Under the ARCHE price list, drilling a 90 m deep well costs PLN 24,000 net. On top of the borehole you need to budget for a submersible pump with fittings and its installation (PLN 700 net + materials under the ARCHE price list).

Service name (borehole):

Price from (net):

Deep well  110Φ

PLN 250 per metre *

Deep well  125Φ

PLN 250 per metre *

Deep well 90m

Ikona Dom

Well for your home

Drilling a deep well is currently the best way to get free, clean water in your home.

Ikona Firma

Well for businesses

Wells for industry and commerce are a fairly popular solution, especially for car washes, swimming pools, thermal baths, spas and agritourism businesses.

Ikona Gospodarstwo

Well for agriculture

Industrial pumps that can move hundreds of metres of water per hour.

How do we drill a well?

Step by step to your deep well in Katowice

1 krok budowy studni głębinowej

1. Free quote

We discuss the borehole, the location and the way it will be carried out

2 krok budowy studni głębinowej

2. Choosing the pump

Choosing the pump and accessories

3 krok budowy studni głębinowej

3. Choosing the location

We decide where on your plot the water will be drawn

4 krok budowy studni głębinowej

4. Drilling the well

The well is drilled on the date you choose.

Book a date for drilling your well

We drill with specialist equipment, the Rotomax XL GT.
With us you get a guarantee of quality.

Reviews

See our projects

Find an answer

Answers to the questions our customers ask most often

 

A complete 90 m deep well costs PLN 32,110-37,115 (including drilling at PLN 24,000 net under the ARCHE price list), depending on the geological conditions of the site and the technical equipment chosen.

 

A 90 metre well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling. The exemption from a water-law permit and notification covers constructing an intake up to 30 m deep for ordinary water use.

 

A 4-inch submersible pump with a capacity of 2.0-4.0 cubic metres per hour and a lift of 110-130 metres of water column. The pump power should be 2.2-3.0 kilowatts. The purchase cost of a submersible pump is PLN 4,500-7,000.

 

A 90 m well pays for itself after 19-38 years of operation with average water use of 150 cubic metres per year. A household saves PLN 900-1,850 per year compared with the cost of mains water.

 

A 90 m deep well produces 2,000-5,000 litres per hour depending on local hydrogeological conditions. This corresponds to 48-120 cubic metres per day, which is enough for any household.

 

Drilling a 90 m well takes 2-3 working days. The rotary drilling itself takes 12-20 hours, and complete installation with the electrical equipment takes 2-3 working days.

 

The water is drinkable but may need treatment. It often contains excess iron (2.0-8.0 mg/l against a standard of 0.2 mg/l) and is hard (12-18°dH). An iron removal system costs PLN 5,500-10,500.

 

The required minimum distances are 5 metres from the plot boundary, 15 metres from residential buildings, 30 metres from liquid waste tanks, and 50 metres from domestic wastewater treatment plants.

 

The annual running cost is PLN 550-900 and covers electricity for the pump (PLN 300-500), technical maintenance (PLN 180-250) and minor repairs (PLN 70-150).

 

Wells can be drilled all year round. In winter work can take slightly longer because of the frozen surface layer of the ground, but modern drilling equipment copes with difficult weather conditions.

 

Check the technical condition of the pump and the well screens. Flushing the well with pumps often helps.

 

The water is of high microbiological quality thanks to natural geological filtration. Typical parameters for the water are hardness of 12-18°dH, pH 7.0-7.8 and iron 2.0-8.0 mg/l. It usually requires an iron removal system.

How much does a deep well cost? Write to us or call

ARCHE S.C logo

Check out our YouTube channel and Facebook:

See the towns where we drill every day!

Free quote form

We call back within 24 hours

OFERTEO