100 m deep well
A 100 metre deep well is an ideal compromise between investment cost and hydraulic performance for owners of single-family homes in Poland. According to the latest market data from 2026, the total cost of building a 100 metre well is PLN 33,480-37,970, and the investment pays for itself after an average of 19-40 years compared with the cost of drawing water from the municipal water mains.
Compare information for other depths: 90 m well. The borehole depth is chosen to suit the conditions on the plot.
- High-quality water from the depths
- Gain independence and never worry about running out of water
- Lower costs compared with mains water
How much does a 100 m deep well cost in 2026?
Cost of a borehole 100 metres deep
At ARCHE, drilling a 100 m deep well costs PLN 26,500 net under the 2026 price list: PLN 9,000 for a borehole up to 30 metres plus PLN 250 for each additional metre (the rate depends on the diameter), i.e. PLN 9,000 + 70 × PLN 250. The price covers drilling, installation of well pipes certified for drinking water, and pumping and cleaning the well. You do not pay for the casing, because we pull it out of the ground once the borehole is finished.
Cost of well equipment
A submersible pump suitable for a 100 metre well costs PLN 3,800-6,200, depending on hydraulic capacity and lift height. For this depth you need a pump with a lift height of at least 110-120 metres (100 m of depth + 10-20 m of working pressure + hydraulic losses in the pipework).
A pressure tank (hydrophore) with a capacity of 150-200 litres costs PLN 900-1,600, a power cable with a cross-section of 4×2.5 mm and a length of 80-100 metres costs PLN 600-900, and a PE32 discharge pipe with a diameter of 32 mm and a length of 80-100 metres costs PLN 500-750. A wellhead with a cable gland costs PLN 280-420, and the electrical connection with protection devices costs PLN 900-1,600.
Total cost of a deep well
A complete 100 metre deep well with full hydraulic and electrical equipment costs PLN 33,480-37,970. The average price for typical geological conditions in Poland is PLN 35,700, including the submersible pump and all accessories.
Calculation of total drilling costs:
100 m deep well
Why use our deep well drilling services?
Top-quality water
The aquifer passes through several filtering layers, which cleans the water effectively.
Lower costs
No more bills for the cubic metres of water you use.
Installation safety
A guaranteed water supply tailored to your needs.
Financial profitability of a 100 m deep well
Payback analysis for a 100 metre well
A 100 m deep well pays for itself after approx. 19-40 years of use, assuming average water consumption of 150 cubic metres a year for a typical household of four. With higher water consumption (garden watering, a pool, a hot tub) the payback period becomes noticeably shorter.
Detailed profitability analysis of a 100m deep well:
| Item | Cost / value |
|---|---|
| Initial cost of a 100 m well | PLN 35,700 (average) |
| Annual cost of mains water | PLN 1,800-2,400 |
| Annual running cost of the well | PLN 550-900 |
| Net annual savings | PLN 900-1,850 |
| Payback period | 19-40 years |
When is drilling a 100 metre well worthwhile?
A 100 m deep well is definitely a profitable investment in the following usage cases:
A 100 metre deep well is definitely a profitable investment where there is no access to the water mains and the cost of a connection exceeds PLN 15,000, where water consumption is high at over 200 cubic metres a year, where intensive garden watering requires an additional 100-300 cubic metres a year, and where the cost of building a water supply connection is substantial because the distance from the mains exceeds 100 metres.
An investment in a 100m well is also worth considering with average water consumption of 100-200 cubic metres a year, access to the water mains at a distance of 50-100 metres from the plot, and a planned increase in water use from building a pool or extending the garden.
Cost comparison: 100 metre well vs municipal water mains for a single-family home
100 m deep well versus municipal water mains. Detailed financial analysis over 10 years of use:
| Comparison criterion | 100m well | Municipal water mains |
|---|---|---|
| Initial cost | PLN 35,700 | PLN 8,000-20,000* |
| Annual running cost | PLN 550-900 | PLN 2,000 |
| Total 10-year cost | PLN 41,200-44,700 | PLN 28,000-40,000 |
| Independence from the supplier | Full autonomy | No independence |
| Water quality | Natural mineralisation | Chlorinated and fluoridated |
| Availability during outages | Continuous | Supply interruptions |
Technical specification of a 100 m well
Hydraulic and yield parameters
A 100 m deep well achieves a hydraulic yield of 1,500-4,000 litres per hour, depending on the local hydrogeological conditions of the site. The static water table is usually at a depth of 60-80 metres below ground level.
Detailed technical specification of a 100m well:
Total borehole depth: 100 metres
Nominal borehole diameter: 150-200 millimetres
Casing diameter: PVC, 125 millimetres
Length of the screen zone: 12-18 metres
Operating yield: 1.5-4.0 cubic metres per hour
Detailed pump parameters for the well
A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a lift height of 110-120 metres is the optimal solution for a 100 metre well. The electrical power of the pump should be 1.5-2.2 kilowatts at a supply voltage of 230 volts. The nominal diameter is 4 inches (100 millimetres), and the purchase cost is PLN 3,800-6,200.
Free quote for a 100 m deep well
Fill in our deep well quote form, or contact us by email or phone.
Water quality from a 100 m deep well
Physicochemical parameters of water from a depth of 100 m
Water drawn from a 100 metre well is of high microbiological quality thanks to natural filtration through successive geological layers. The total hardness of the water averages 10-16 German degrees, and the pH falls within the range of 6.9-7.6 pH units.
Typical physicochemical parameters of water from a 100m well:
| Parameter | Value range | Standard | Status |
|---|---|---|---|
| Total hardness | 10-16°dH | no standard | hard |
| pH | 6,9-7,6 | 6,5-9,5 | within standard |
| Iron | 1,5-6,0 mg/l | 0,2 mg/l | above standard |
| Manganese | 0,08-0,5 mg/l | 0,05 mg/l | above standard |
| Pathogenic bacteria | absent | absent | within standard |
| Nitrates | <10 mg/l | 50 mg/l | within standard |
Water treatment systems for a 100m well
An iron and manganese removal system is the most commonly required water treatment system for water drawn from 100 metre wells. The cost of a complete system is PLN 5,500-10,000 for a capacity suited to supplying a household.
Ion-exchange water softeners, which lower water hardness, are also available for PLN 3,500-6,500, as are UV disinfection lamps, which eliminate bacteria and viruses, for PLN 900-1,800.
Permits for a 100 m deep well
What permits are required to drill a well?
Under the Water Law Act (Prawo wodne) (Articles 33 and 395), constructing a water intake up to 30 m deep for ordinary water use and abstracting on average no more than 5 m³ per day for your own household or farm are exempt from a water-law permit and a water-law notification. A 100 m deep well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling.
These are separate conditions: one concerns constructing the intake, the other abstracting the water. A deeper borehole, or using water beyond ordinary use, requires checking the applicable procedure with Wody Polskie.
Formalities for a 100 m well
Because the borehole is deeper than 30 m, the applicable procedure and required documents must be checked with Wody Polskie before work starts. Siting requirements, source protection rules and geological regulations also apply, so before drilling we check the well location and the minimum distances listed below.
Minimum distances of a 100m well from structures
Required distances of a 100 metre well from various structures on the plot in accordance with the Minister of Health regulation on the quality of water intended for human consumption:
| Object / boundary | Minimum distance from the well |
|---|---|
| Neighbouring plot boundary | 5 m |
| Houses and outbuildings | 15 m |
| Liquid waste tanks | 30 m |
| Domestic wastewater treatment plants | 50 m |
| Sealed septic tanks and soakaways | 70 m |
The well-building process step by step
Stage one: geological surveys and siting
Geophysical surveys using electrical resistivity tomography before drilling a well cost PLN 1,800-2,500 for a 400 metre profile and make it possible to determine the optimal well location and the expected hydraulic yield with 90-95 percent accuracy. An alternative is an analysis of PIG hydrogeological maps for PLN 300-600 or free observation of indicator vegetation.
Stage two: drilling the 100 metre borehole
Drilling a deep well takes 20-33 working hours in standard ground conditions in Poland. A truck-mounted drilling rig with a power of 150-200 hp drills a borehole with a diameter of 150-200 millimetres at an average speed of 3-5 metres per hour.
The complete process includes preparing the drilling site in 1 hour, the drilling itself within 20-33 hours, installing the casing string over 2-3 hours, and cleaning the well with pumps, which takes 1-2 hours.
Stage three: installing the electrical equipment
Installing a submersible pump in a 100m well requires a YKYY 4×2.5 mm cable with a length matched to the pump setting depth (80-100 metres). The pump is placed below the dynamic water level (the depth is set after the pumping test).
Installing the pump system includes installing the pump at the set depth, routing the power cables through a sealed wellhead, installing the pressure tank (hydrophore) in the building or in a water meter chamber, and connecting to the home’s water supply system.
Maintenance and operation of a 100m well
Inspection schedule for a 100 metre well
A technical inspection of a 100m well should take place every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400, including consumables.
Maintaining a 100m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.
Annual running costs of a well 100 metres deep
Running a 100 metre well costs PLN 550-900 a year for a standard household of four using 150 cubic metres of water. The pump’s electricity consumption is 1.6-2.2 kilowatt-hours per cubic metre of water produced.
The annual running costs of a 100m well consist of electricity for the pump at PLN 300-500 (150 m³ × PLN 2.0-3.3/m³), maintenance and technical inspections at PLN 180-250, and minor repairs and replacement of parts at PLN 70-150, giving a total annual cost of PLN 550-900.
Book a well drilling date
We build deep wells in every type of ground! Deep well drilling has been our passion since 2019! Get in touch and find out the cost of building a deep well!
Comparison of the 100m deep well with other depths
Comparison with other depths
| Depth | Construction cost (borehole) | Water-law permit | Yield | Payback |
|---|---|---|---|---|
| 25 metres | PLN 9,000 | Not required | 1,300-3,600 L/h | 8-15 years |
| 35 metres | PLN 10,250 | To be checked with Wody Polskie | 1,600-3,900 L/h | 8-16 years |
| 100 metres | PLN 26,500 | To be checked with Wody Polskie | 1,500-4,000 L/h | 19-40 years |
Maintenance and operation of a 100m well
Inspection schedule for a 100 metre well
A technical inspection of a 100m well should take place every 6 calendar months, covering a check of the water level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400, including consumables.
Maintaining a 100m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 8-12 years.
Annual running costs of a 100 metre deep well
Running a 100m well costs PLN 550-900 a year for a standard household of four using 150 cubic metres of water. The pump’s electricity consumption is 1.6-2.2 kilowatt-hours per cubic metre of water produced.
The annual running costs of a 100m well consist of electricity for the pump at PLN 300-500 (150 m³ × PLN 2.0-3.3/m³), maintenance and technical inspections at PLN 180-250, and minor repairs and replacement of parts at PLN 70-150, giving a total annual cost of PLN 550-900.
What does the well drilling price include?
The overall price for drilling a deep well is calculated according to the rate – per metre of borehole – and depends on the depth of the hole to be drilled.
The cost of such a well depends on several parameters. Remember that the cost may also vary with the location where the deep well drilling takes place.
When drilling a well, the price is affected by:
- the depth of the drilled well
- the diameter of the well casing
- the type of slotted well screen
When installing and equipping the well, the price is affected by:
– the type of well enclosure
– the type of submersible pump
– the type of pumping set installation
– the size of the pressure tank (hydrophore)
– the type of wellhead
– the number of concrete rings
– the type of pump, pressure tank and pressure switch
– the length of the pipeline bringing water to the house
– the depth of the trench, the pressure line trench and the power supply
In most cases the company can only give a price for the service after talking to the customer. A borehole up to 30 metres costs PLN 9,000 net, and each additional metre PLN 250 net (depending on the diameter).
Keep in mind that the cost of drilling a well sometimes includes the cost of the pipes. It is therefore worth checking whether this is the reason for an inflated price. A higher price should be justified: as we mentioned above, the reason is often simply the need to drill a wider hole or to use a more expensive drilling method because of the geological conditions.
Under the ARCHE price list, drilling a 100 m deep well costs PLN 26,500 net. On top of the borehole you need to budget for a submersible pump with fittings and its installation (PLN 700 net + materials under the ARCHE price list).
|
Service name (borehole): |
Price from (net): |
|
Deep well 110Φ |
PLN 250 per metre * |
|
Deep well 125Φ |
PLN 250 per metre * |
100 m deep well

Well for your home
Drilling a deep well is currently the best way to get free, clean water in your home.

Well for businesses
Wells for industry and commerce are a fairly popular solution, especially for car washes, swimming pools, thermal baths, spas and agritourism businesses.

Well for agriculture
Industrial pumps that can move hundreds of metres of water per hour.
How do we drill a well?
Step by step to your deep well in Katowice

1. Free quote
We discuss the borehole, the location and the way it will be carried out

2. Choosing the pump
Choosing the pump and accessories

3. Choosing the location
We decide where on your plot the water will be drawn

4. Drilling the well
The well is drilled on the date you choose.
Book a date for drilling your well
We drill with specialist equipment, the Rotomax XL GT.
With us you get a guarantee of quality.
Reviews
Find an answer
Answers to the questions our customers ask most often
A complete 100m deep well costs PLN 33,480-37,970 (including drilling at PLN 26,500 net under the ARCHE price list), depending on the geological conditions of the site and the technical equipment chosen.
A 100 metre well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling. The exemption from a water-law permit and notification covers constructing an intake up to 30 m deep for ordinary water use.
A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a lift of 110-120 metres of water column. The pump power should be 1.5-2.2 kilowatts. The purchase cost of a submersible pump is PLN 3,800-6,200.
A 100m well pays for itself after 19-40 years of use at average water consumption of 150 cubic metres a year. A household saves PLN 900-1,850 a year compared with the cost of mains water.
A 100m deep well produces 1,500-4,000 litres per hour, depending on local hydrogeological conditions. That equates to 36-96 cubic metres per day: enough for any household.
Drilling a 100m well takes 2-4 working days. The rotary drilling itself takes 20-33 hours, and the complete installation with the electrical equipment takes 2-3 working days.
The water is drinkable but may need treatment. It often contains excess iron (1.5-6.0 mg/l against a standard of 0.2 mg/l) and is hard (10-16°dH). An iron removal system costs PLN 5,500-10,000.
The required minimum distances are 5 metres from the plot boundary, 15 metres from houses, 30 metres from liquid waste tanks and 50 metres from domestic wastewater treatment plants.
The annual running cost is PLN 550-900 and covers electricity for the pump (PLN 300-500), technical maintenance (PLN 180-250) and minor repairs (PLN 70-150).
Wells can be drilled all year round. In winter work can take slightly longer because of the frozen surface layer of the ground, but modern drilling equipment copes with difficult weather conditions.
Check the technical condition of the pump and the well screens. Flushing the well with pumps often helps.
The water is of high microbiological quality thanks to natural geological filtration. Typical parameters for the water are hardness of 10-16°dH, pH 6.9-7.6 and iron 1.5-6.0 mg/l. It usually requires an iron removal system.
How much does a deep well cost? Write to us or call
Drilling tips
Read the latest posts on our blog. Gather the knowledge you need before choosing the best option for you.