Inspections, winter and restarting
The maintenance plan should follow from the equipment manuals and how you use the well. A year-round home and a seasonal plot need different arrangements for the work.
Build your own schedule
For each device, write down the recommended tasks, the date and who carries them out. Separate the user's visual checks from servicing that requires qualifications. Record the source of each date: the manual, the installer's recommendation or a test result.
In the well calendar you can enter your own dates. The tool does not create a general obligation for annual disinfection or a single testing date for all intakes.
Visual check of accessible parts
- Check for visible leaks, damage to the cover and the condition of the surroundings.
- See whether rainwater collects around the intake.
- Note the pressure, alarms and any unusual change in the number of starts.
- Check the servicing date for the filters in their documentation.
- Keep access to valves and devices clear.
Do not open electrical parts and do not unseal the system while it is under pressure.
Before the frost
Mark on the diagram the seasonal sections and the devices in unheated places. Agree with the installer how to isolate, drain and protect them in line with the manuals. Disconnecting the power does not remove the water from pipes and housings.
Do not assume a single draining procedure for every pump, tank and water treatment system. Some components need separate handling from the manufacturer.
After winter and a longer shutdown
Look over the accessible parts before starting. If there are signs of freezing, a leak or flooding, have it checked. Restore operation according to the manuals and the service centre's recommendations, and assess water quality to the extent appropriate to the planned use.
Record the start-up date, your observations and any repairs needed.
Sources:
Checked 8 October 2026