A well for farming: how much water you need and the formalities in 2026

A well for farming starts with working out the water you need, not with drilling. You need the annual total and the peak abstraction per day and per hour, and then a comparison with the threshold of 5 m³ per day (on an annual average), which decides whether ordinary use of water is enough. Legal position as at 16 November 2026.
A well for farming: what the amount of water depends on
The amount of water comes from four items: watering livestock, irrigation, spraying and washing. You work out each one separately, and only then the annual total and the peak daily and hourly abstraction.
| Use | What to work out | What to watch for |
|---|---|---|
| Watering livestock | the number of animals and their requirement from feeding guidelines or from an adviser or veterinary surgeon | the pump stops during a power cut, so you need a reserve in a tank or emergency power |
| Crop irrigation | the area, the dose, the number of sections running at the same time | the dose depends on the crop, soil and weather, there is no single value for the whole season |
| Spraying | the volume of spray liquid and the time to fill the sprayer | check the water quality requirements on the product label |
| Washing and other needs | the consumption on the busiest day | often falls in the same hours as watering livestock |
We do not give water consumption norms per animal or per hectare here. They depend on the species, the breed, the type of production and the weather, and reliable values come from feeding guidelines, an agricultural adviser or a veterinary surgeon.
For converting volumes, one relationship is enough: 1 mm of water on 1 ha is 10 m³. A dose of 10 mm on 2 ha is therefore 200 m³, before you add the losses in the installation. This is an arithmetic example, not a recommendation for a particular crop.
For comparison: 5 m³ per day on an annual average is about 1,825 m³ over a year (5 × 365). A dose of 200 m³ is 40 days of such a limit. If you water several times in the season, the annual balance has to be worked out over the calendar, not from a single day. A balancing tank will help spread the peak abstraction over time, but it will not increase the yield of the well itself.
Ordinary use or a permit: formalities on a farm
Constructing a water intake of up to 30 m for ordinary use of water, and abstraction not exceeding 5 m³ per day on an annual average for the needs of your own household or farm, are exempt from a water-law permit and notification (Article 33 and Article 395 of the Water Law Act). These are separate conditions, one concerning the construction of the intake and the other the abstraction of water. A deeper borehole, or use of the water beyond ordinary use, requires the correct procedure to be checked with Wody Polskie. The exemption does not remove location requirements, intake protection rules or geological regulations.
We read the text of the Act in the Water Law Act (Prawo wodne), consolidated text, Dz.U. 2026 poz. 1335. Three distinctions follow from it for a farmer.
| Situation | How the Water Law Act treats it | What next |
|---|---|---|
| An intake of up to 30 m, abstraction up to 5 m³ per day on an annual average, for the needs of your own farm | ordinary use of water (Article 33), exemption under Article 395 | no water-law permit or notification, but location and geological regulations still apply |
| Irrigating land or crops, or the needs of farming activity, in an amount greater than 5 m³ per day on an annual average | special use of water (Article 34 point 12) | usually a water-law permit (Article 389), confirm the scope with Wody Polskie |
| A borehole deeper than 30 m | outside the exemption in Article 395 point 5 | a procedure with Wody Polskie and possibly geological regulations |
The limit of 5 m³ per day is counted as an annual average and applies to the needs of your own household or farm. Do not check it against a single reading from a hot day, but do not assume either that irrigation fits within it by default. The right to ordinary use belongs to the landowner (Article 33 section 1). If you farm leased land, ask Wody Polskie on what basis you may use it.
Geological regulations are a separate layer. Drilling of up to 30 m for abstraction of up to 5 m³ per day is excluded from the requirement for geological documentation and a design (Article 3 point 2a of the Geological and Mining Law, Prawo geologiczne i górnicze), outside mining areas for medicinal waters and brines. Depending on the depth, the amount of water and the area, geological regulations may apply, so there is no single rule for every well. The geological qualifications required and the authority to which the design is submitted are established for the specific project. We have described the details of ordinary cases in our article on whether a deep well needs a permit.
When abstraction exceeds the threshold or the water serves a business, charges may arise, depending on the permit. If the water serves a business other than farming (Article 34 point 13), the rules are different, and we cover them separately in our article on a deep well for businesses.
A well without documents
A well built without the required permit or notification can be legalised with Wody Polskie. The owner of an intake built before 18.08.2026 who submits a complete application for legalisation by 31.12.2027 is exempt from the legalisation fee (Article 524a of the Water Law Act), and in that case no penalty is imposed for the lack of a permit or notification either. Without such legalisation, using water or building an intake without the required consent carries an administrative fine in the range of PLN 5,000 - 1,000,000, depending on the case. The procedure and documents are described by Wody Polskie on the page about legalising a water installation.
How to size the well yield and the pump for a farm
The yield of a well is established by a pumping test, and the pump is sized to the flow and the pumping head at the operating point. Neither the diameter of the pipes nor the depth alone is assigned a specific yield.
The order is as follows:
- Work out the peak abstraction: how many sections, animals and outlets can run at the same time.
- Commission a pumping test and read off the safe yield, the dynamic water level and the recovery of the water level.
- Size the pump to the required flow and pumping head, taking in the dynamic water level, the difference in height to the outlet, the required pressure and the losses in the pipelines.
- Check that the pump’s working output does not exceed the safe yield of the well. If it does, reduce the abstraction or add a tank.
We have described the results and how to interpret them in our article on deep well yield. How to choose a unit from the performance curves is covered in our guide on what pump for a deep well. Maximum head and maximum flow do not occur at the same time, so read the curve of the specific model, not just the values on the plate.
In irrigation, the emitter pressure, the losses on the filters and protection against dry running also count. With variable abstraction, when sometimes one section runs and sometimes several, a set with a variable frequency drive maintains constant pressure. You will find a broader explanation in our article on a variable frequency drive for a submersible pump. ARCHE installs sets with a variable frequency drive and with a pressure switch.
Water quality for livestock, crops and spraying
Whether the water is suitable is decided by a laboratory test, and its scope depends on the intended use. Clarity, lack of smell and the depth of the borehole confirm nothing.
For water drunk by people, the regulation of the Minister of Health of 22.05.2026, Dz.U. 2026 poz. 748 applies: the parametric value for nitrates is 50 mg/l, and for E. coli and enterococci 0 in 100 ml. The State Sanitary Inspectorate (Sanepid) recommends testing well water before first use and at least once a year, and also after flooding or a failure. A test is recommended, not mandatory. If people use the same well, measure the result against precisely these values.
For livestock, washing equipment and food production, agree the scope of testing with a veterinary surgeon or an agricultural adviser. For irrigation and spraying, check in turn whether the water leaves deposits in filters and emitters, and what the plant protection product label says about water quality. We have described the scope and course of taking a sample in our article on well water testing. If contamination is suspected, use another source of water for drinking and preparing food, and do not judge the result by eye.
Funding: check the current call
There is no single programme intended for a well on a farm. Support is decided by the specific call: who can apply, which costs are eligible and when you may start the investment.
The page of open ARiMR calls (checked on 16.11.2026) lists three calls: development of small farms (until 28.11.2025), start-up premiums for young farmers (until 30.07.2026) and tailored training (until 18.06.2026). All of the deadlines have already passed, and the names do not suggest that any of them concerns wells or irrigation directly. So we do not promise a grant. We have collected the rules and warnings about the date you may start the investment in our article on funding for a deep well.
When to commission a borehole on a farm
You commission a borehole when you have worked out the peak abstraction, know whether you fit within ordinary use, and have a plan for the place for the intake, the tank and the power supply.
ARCHE drills a deep well borehole in Lesser Poland and Silesia using the percussion method. After drilling we carry out a pumping test and give a 2-year warranty. We also install pumps and sets with a variable frequency drive, take and test water samples, and choose water treatment based on the results. The power supply work is done by our own qualified electrician. In the price list, a borehole of up to 30 m costs PLN 9,000 net, and each additional metre PLN 250 net. Deeper boreholes, which a larger abstraction sometimes requires, are quoted from the same price list.
Already worked out your requirement? Describe your farm and planned abstraction to us or call: +48 784 038 407 or +48 692 353 826. We call back within 24 hours and agree the depth, the yield and the pumping set.
Frequently asked questions
Does a well on a farm need a water-law permit?
No, if the intake is up to 30 m and abstraction for the needs of your own farm does not exceed 5 m³ per day on an annual average. Above that threshold, or with water used beyond ordinary use, you need to check the procedure with Wody Polskie.
How much water can you take from a well without a permit?
Up to 5 m³ per day on an annual average, for the needs of your own household or farm. It is an average over the whole year, so a single day of heavier abstraction does not settle the matter, but you do have to work out the whole balance.
Can I irrigate fields with water from a deep well?
Yes, provided the formalities are matched to the amount of water. Under the Water Law Act, irrigating land or crops in an amount greater than 5 m³ per day on an annual average is special use of water (Article 34 point 12). Check with Wody Polskie beforehand which documentation applies to you.
Is well water suitable for livestock?
That cannot be judged without a test. Have the water tested in a laboratory and discuss the result with a veterinary surgeon, because we do not give norms or diagnoses for animals. If people also use the water, compare the result with the values in the regulation for drinking water.
Is there a grant for a well on a farm?
There is no single programme for a well alone. Support depends on the current ARiMR call or that of another institution, and its conditions and deadlines must be checked before you start the investment. We do not promise funding.
Sources
- Prawo wodne, consolidated text Dz.U. 2026 poz. 1335 (Articles 33, 34 points 12 and 13, 389, 395)
- Prawo geologiczne i górnicze, consolidated text Dz.U. 2026 poz. 69 (Article 3 point 2a)
- Rozporządzenie Ministra Zdrowia z 22.05.2026 w sprawie jakości wody przeznaczonej do spożycia przez ludzi, Dz.U. 2026 poz. 748
- Wody Polskie: legalizacja urządzenia wodnego
- ARiMR: open calls under the CAP Strategic Plan 2023 - 2027