Deep well for business: formalities, water abstraction and charges

A deep well for business is possible, but abstracting water for commercial activity counts as special use of water. When the water serves a business, it is usually not enough to rely on ordinary use of water, so you need to check the procedure with Wody Polskie before drilling begins. Legal position as at 16.11.2026.
This article is about plants, services and industry: car washes, workshops, production halls and service premises. A farm has separate rules, and a private home has yet others.
How a deep well for business differs from a domestic and an agricultural one
A business does not use water on the basis of ordinary use, which the Water Law Act (Prawo wodne) leaves to a landowner for the needs of their own household or farm. Using water for commercial activity other than farming is special use (Article 34 point 13), and the provision sets no quantity threshold here. A water-law permit is required for special use of water (Article 389), as set out in the Water Law Act, consolidated text Dz.U. 2026 poz. 1335.
| Home | Farm | Business | |
|---|---|---|---|
| Type of water use | ordinary use for the needs of your own household | ordinary use for the needs of your own farm | special use (Article 34 point 13) |
| Abstraction | up to 5 m³ per day on annual average without a permit | above 5 m³ per day for irrigation or farming activity counts as special use | water-law permit, quantity set in the permit |
| Constructing the water intake | exemption for intakes up to 30 m for ordinary use (Article 395 point 5) | as above, for ordinary use | to be checked with Wody Polskie, do not assume the exemption |
| Where to look next | deep well permit | wells for farming | this article |
Do not assume the exemption just because the water will be used by employees for sanitary purposes. Abstraction for business needs requires a separate assessment even when the quantity of water is small. The final decision on whether a permit is required is made by the relevant Wody Polskie unit.
How much water a business needs and how to calculate it
Demand is not a single figure. Separate sanitary, process, washing, cooling and watering needs and any fire safety requirements, and for each group determine the daily, peak and annual abstraction and the water quality you expect.
The same figures will later go into the application, because a permit for groundwater sets the maximum abstraction per second, the average per day and the allowed amount per year. That is why it is worth calculating the balance carefully. Allow for seasonality and the planned growth of the business.
The balance has to be set against how much water the intake itself can deliver. A pumping test shows this, and we describe the principles in the guide to deep well yield. A balancing tank can cope with a short peak, but it cannot replace the resources of the aquifer. The working capacity of the pump should not exceed the safe abstraction rate established for the well.
Water quality depends on the intended use. Washing cars or cooling has different needs from food production or water supplied to people for drinking. The reference point for drinking water is the Minister of Health regulation of 22.05.2026 (Dz.U. 2026 poz. 748): 0 per 100 ml for E. coli and enterococci, and a parametric value of 50 mg/l for nitrates. Whether and to what extent it applies to your plant, confirm with the district sanitary station (PSSE). There is no single treatment technology for every industry, and reverse osmosis is not a mandatory element of every business well. Choosing the treatment starts with a water test.
What formalities to complete before drilling
Wody Polskie stress that a water-law permit must be obtained before the investment is carried out. The order of work is as follows:
- Calculate the demand: daily, peak and annual.
- Ask Wody Polskie about the procedure for constructing an intake and abstracting water for commercial activity. A description of the application and its annexes is on the page of Wody Polskie on the water-law permit, which mentions, among other things, a water-law assessment (operat wodnoprawny) with a description of the planned activity.
- Check the geological regulations. The exemption under Article 3 point 2a of the Geological and Mining Law (Prawo geologiczne i górnicze) applies to boreholes up to 30 m with abstraction not exceeding 5 m³ per day, so with greater abstraction or a deeper borehole, hydrogeological documentation and a geological works project may also be required. Geological qualifications are required, and the approving authority may be the district governor (starosta) or the voivodeship marshal (marszałek województwa), depending on the case.
- Agree the location of the intake with the designer and the district office (starostwo). The previous regulation on technical conditions ceased to apply in September 2026 and the new one has not yet been published, so distances from the boundary, the septic tank and buildings are set with the designer and the district office, based on previous practice and draft regulations.
- Only after these arrangements order the borehole and the pumping test.
- Once the well is in operation, test the water and choose the treatment according to the result.
An exemption from the permit does not remove location requirements, protection of intakes or the geological regulations. Building the well enclosure alone does not require a building permit or notification (Article 29 section 2 point 25 of the Construction Law), but that does not exempt the other work around the well.
Water abstraction charges and metering
For abstracting groundwater, a water service charge is payable, made up of a fixed charge and a variable charge depending on the quantity of water abstracted (Articles 268 and 270 of the Water Law Act). For a business, charges may apply depending on the permit, so do not assume there will be none. We do not give rates, because they change and depend on the type of abstraction. The fee for issuing the permit itself and its amount are given on the Wody Polskie website.
Plants that abstract water are obliged to measure the quantity of water abstracted and keep a record of those measurements (Article 101 section 1 of the Water Law Act). Entities paying for water services must also have measuring devices to determine the quantity of water abstracted (Article 303 section 1). If the payer does not take measurements, the increased charge is calculated on the assumption that the abstraction conditions in the permit have been exceeded (Article 282 section 5). In practice, a water meter is planned at the intake from the outset, together with a place to read and service it. The scope of measurements and the way they are taken follow from the permit, so agree them with Wody Polskie.
For a business, the well and the water abstraction may also be subject to other rules: property tax, the water-law permit and water service charges. The Local Taxes and Charges Act brings structures connected with running a business within the scope of the tax (Article 2 section 1 point 3, consolidated text Dz.U. 2025 poz. 707). Whether and how your well is taxed is assessed by the municipality. We describe the rules for a private user in the article on tax on a well. We do not give tax amounts, because the municipality sets them.
A borehole for a business: depth, construction and cost
Businesses more often than homes need higher yield, which often means a deeper borehole or several intakes. With deeper boreholes, the geological regulations and the investigation of the aquifer matter more. An example of deeper drilling is described on the page about a 100 m deep well.
ARCHE carries out deep well drilling in Lesser Poland (Małopolska) and Silesia using the percussion method, with a Rotomax XL GT rig. We line the well with PVC-U well casing of 125 mm with a filter gravel pack, and after drilling we carry out a pumping test. We give a 2-year warranty. A borehole up to 30 m costs PLN 9,000 net, each additional metre PLN 250 net. The full range of prices is in the price list.
A plant that needs a borehole not for abstracting water but for heating a hall or an office is looking for a different service: we describe it in the guide to boreholes for a heat pump.
A well and mains water in one plant
A well and mains water can serve one building, but the arrangement must not allow secondary contamination of the network. The safe option is separate installations. If the design provides for supplying a shared system, choose the solution and the backflow protection with a licensed designer and agree it with the water utility. A non-return valve or a BA-type backflow preventer alone is not a universal permission to connect the two sources. It is also worth planning a substitute water source for when the pump fails and the option of removing the pump quickly.
Whether having your own well pays off
Whether it pays off only emerges from a full calculation. Work out the outlay: investigation, documentation, borehole, installation, treatment and commissioning. In annual costs, include pump energy, water tests, treatment materials, servicing and water service charges. Having your own intake does not remove the cost of discharging wastewater, so compare it with the actual sewerage billing or another way of handling wastewater, including that from treatment. Also check the standing charges if you keep the mains water connection.
A simple payback period is the additional outlay divided by the annual net saving. When the saving is zero or negative, there is no payback. For scale: according to the Wodociągi Miasta Krakowa tariff from 01.02.2026, water and sewage together come to PLN 14.86 per m³ gross (water PLN 6.76, sewage PLN 8.10, tariff group 1 - 14, in the first 12 months of the tariff). That is one tariff of one utility, so check the rate for your own plant with your local water utility. Prices are indicative, checked on 16.11.2026.
Do not put a subsidy in the budget until you have confirmed the terms of the current call, the eligible costs and the date from which work may start.
Do you already have a well without the required documents? The owner of a groundwater intake built before 18.08.2026 who submits a complete legalisation application by 31.12.2027 is exempt from the legalisation fee (Article 524a of the Water Law Act), and in that case no penalty is imposed for the lack of a permit or notification. The scope does not automatically cover all cases, and we describe the conditions in the article on legalising a well.
What to collect from the contractor
The construction and pumping documentation, the safe operating parameters, the water test results, the equipment manuals, the commissioning report and the terms of servicing and warranty. Also ask where the water meter should be installed and how to read it, because the billing of abstraction depends on it.
Planning an intake for a plant? Write to us or call: +48 784 038 407 or +48 692 353 826, we call back within 24 h. We will discuss the demand, the borehole depth and the scope of work on your plot.
Frequently asked questions
Can a business drill a deep well without a permit?
Usually not. Abstracting water for commercial activity other than farming is special use of water, and that means a water-law permit. The exemptions under Article 395 apply to ordinary use for the needs of your own household or farm. Wody Polskie will confirm the procedure for a particular plant.
Does the 5 m³ per day limit apply to businesses too?
The limit of 5 m³ per day is counted as an annual average and applies to ordinary use for the needs of your own household or farm. For commercial activity it is not enough to rely on it, even when the abstraction is small. For a business, the provision on special use sets no quantity threshold.
Does a business pay for water from its own well?
It may. A water service charge is provided for abstracting groundwater, made up of a fixed charge and a variable one depending on the quantity of water. Whether it applies to your plant, and in what amount, follows from the permit, so check it with Wody Polskie. On top of that come the costs of the pump, energy, tests and treatment.
Does water from a business well have to meet drinking water quality?
It depends on what it is used for. Water for washing or cooling has different requirements from water used in food production or for drinking by employees and customers. The values in the drinking water regulation are a reference point, and you should confirm the scope for your plant with the district sanitary station and start with a laboratory water test.
Can a well be connected to mains water in a business building?
Only in an arrangement that rules out secondary contamination of the network. It is safest to run the two installations separately. If the installations are to be connected, choose the solution and the backflow protection with a licensed designer and agree it with the water utility.
Sources
- Prawo wodne, consolidated text Dz.U. 2026 poz. 1335 (Sejm, ELI): Articles 33, 34, 101, 268, 270, 282, 303, 389, 395, 524a
- Wody Polskie: water-law permit: when it is required, the water-law assessment, what the permit sets, the issuing fee
- Wody Polskie: legalizacja urządzenia wodnego: the application and annexes for legalisation
- Ustawa o podatkach i opłatach lokalnych, consolidated text Dz.U. 2025 poz. 707: tax on structures connected with commercial activity
- Rozporządzenie Ministra Zdrowia z 22.05.2026, Dz.U. 2026 poz. 748: values for water intended for human consumption
- Wodociągi Miasta Krakowa: tariff and price lists: an example of water and sewage rates