Construction and equipment

Deep well service line to the house: route, trench and PE pipe

Mateusz Skotnicki , updated 9 min read

Deep well service line: pipe and cable running from the well to the house

A deep well service line is the section between the well and the building: a PE pipe carrying drinking water and a separate cable powering the pump, laid in a trench below the frost line and brought into the house through a watertight opening in the foundation. The cost depends mainly on the length of the route, the ground and how the line enters the building, so the first step is to draw the route and only then ask for a quote.

What a deep well service line consists of

In practice, a service line is four elements laid in one trench: the water pipe, the pump cable, protection for both and the entry into the building. The pump, pressure tank and controls are a separate part of the installation, which starts at the well and ends in the house.

Element What it is for What to watch out for
PE pipe approved for drinking water Carries water from the wellhead to the building Grey or sewer pipe is not suitable, so check the approval
Pump power cable in a protective sleeve Powers the pump submerged in the well The sleeve protects against damage during excavation and backfilling, and an electrician makes the connection
Sand bedding and warning tape Protect the pipe during backfilling and warn of future groundworks The tape is laid above the lines, before the trench is backfilled
Opening through the foundation or wall Brings the pipe and cable into the building It must be watertight, otherwise ground moisture gets into the boiler room or cellar

We describe how to match the pump to the lift height and flow rate in the guide which pump for a deep well. You will find the full layout of the installation inside the building (tank, controls, filters, distribution to the draw-off points) in the article connecting a deep well to the house.

How to plan the route from the well to the house

The route does not have to be a straight line, and it usually is not. Mark on the plot plan the path from the well to the point where the line enters the building, together with the obstacles: trees, paving, existing utilities, steps and the driveway. Measure the actual length of the trench and the difference in height between the well and the building.

We have collected the information worth gathering before you talk to a contractor in the guide well service line to the house: data for design and quotation. It is easier to fill in using the service line planner, and you can attach the summary to your enquiry.

Two things need to be settled before digging starts:

  • who carries out the excavation, bedding, backfilling and reinstatement of the surface (the owner or the contractor),
  • where the pipe enters the building and whether there is a frost-free room at that point.

The shorter the route, the less pipe, cable and groundwork. That is why, when choosing the location for the borehole, it is worth thinking about the distance from the house straight away.

How deep to lay the pipe from the well to the house

The pipe is laid below the local frost line, with a margin. There is no single figure for every plot, because it depends on the region, the ground and whether a driveway cleared of snow lies above the pipe.

We have collected the frost depth zones for Lesser Poland and Silesia in the article on frost depth in the ground. As a reference point, you can use the requirements that water utilities set for connections to the municipal network. In its conditions for making service connections, the Regional Water and Sewage Company in Tychy requires at least 1.4 m of undisturbed ground above the pipeline. Where the cover is between 1.0 and 1.4 m, the pipeline must be insulated, and cover of less than 1.0 m is not permitted.

These are requirements for the water supply network, not a rule for a private well, but water in a pipe from a well freezes in exactly the same way. Shallower sections, usually at the well and at the foundation, need separate protection. In its brochure on freeze protection, the manufacturer of Thermaflex pipe insulation shows that in a pipe with no flow, insulation only extends the time to freezing. In the sample calculation for a 50 mm pipe in ground at -3°C, this is 1.9 to 3.3 hours, depending on the thickness of the insulation.

A slope in the pipe towards the well does not by itself guarantee that the water will drain out of it. An installation used only seasonally must be designed so that it can be shut off and drained.

Trenching and laying the service line step by step

The order of work is always similar, and only the depth and the method of protection change.

  1. Mark out the route and check that it does not cross other utilities.
  2. Dig the trench below the frost line, leaving room for the bedding.
  3. Spread a layer of sand bedding on the bottom.
  4. Lay the PE pipe and the pump power cable in its sleeve. Do not twist or tension the lines.
  5. Cover them with sand and lay warning tape above them.
  6. Bring both lines in through the opening in the foundation or wall.
  7. Carry out a leak test and only then backfill the trench in layers.

The pump cable ends at the distribution board or at the controller, so the power supply, protection and measurements are carried out by a person with electrical qualifications. The circuit separation and the residual current device are selected by the electrician for the specific set of equipment.

Passing through the foundation and entering the building

Through the foundation or cellar wall, the pipe is led in a sleeve sealed so that it does not let groundwater in. In its conditions, the water utility in Tychy requires watertight plastic sleeves and rules out petroleum-based sealants for plastic pipes. Choose the sealing method to suit the pipe material and the wall construction, together with the contractor.

The pipe enters a room that stays frost-free in winter. That is usually where the shut-off valve and the tank with its control set are located, which we describe in the guide pressure tank for a deep well.

Inspection before backfilling the trench

The tightness of the pipe and joints is checked before the trench is backfilled. When accepting connections to the network, the water utility in Tychy requires the results of leak tests and carries out the inspection in the open trench. For a service line from a private well the principle is the same: a fault is easy to repair only until the trench is filled in.

Take photos of the route with a tape measure and keep a record of the pipes, joints and wall openings. When groundworks come up in a few years, you will know where the pipe and cable run.

How much a deep well service line costs

ARCHE prices a complete service line installation at PLN 1,500 net plus materials. Pump installation costs PLN 700 net plus materials. You can check the current items and their scope in the price list, and who carries out the excavation and surface reinstatement is agreed when we quote for your specific route.

Do not confuse this with a connection to the water mains. That is a separate matter with its own price list from the local water utility, described in the article how much a water connection costs.

We install the well service line together with submersible pump installation, also in wells drilled by other contractors, provided the well is suitable for use with a pump. We work in Lesser Poland and Silesia.

Do you have a route from the well to the house and want to check how to lay it? Write to us or call: +48 784 038 407. We will agree the route, the depth and the point where the line enters the building.

Frequently asked questions

What is a deep well service line?

It is the section of the installation between the well and the building. It consists of a water pipe and a pump power cable, laid in a trench below the frost line, and an opening through the foundation or wall. The tank, controls and filters are already inside the building.

How deep should the pipe from the well to the house be laid?

Below the local frost line, with a margin. For the municipal network, the water utility in Tychy requires cover of at least 1.4 m and does not permit less than 1.0 m. Agree the specific value for your plot with the contractor.

Which pipe is suitable for a water service line from a well?

PE pipe approved for drinking water. A sewer pipe is not suitable. The diameter and type of pipe are chosen to suit the pump and the length of the route, together with the contractor.

Can the pipe and cable lie in the same trench?

Yes, this is a common solution. The cable must have a sleeve to protect it from damage, and both lines are laid on a sand bedding and marked with warning tape. The power supply is connected by a qualified electrician.

What should you do if the pipe cannot be laid to full depth?

The shallower section must be protected additionally. You can insulate the pipe and, where the water is standing, also fit a heating cable with a thermostat, or shut off and drain the installation for the winter. Insulation alone only delays freezing.

What does the cost of a well service line depend on?

On the length of the route, the type of ground, the number of obstacles, the way the line passes through the foundation and the equipment chosen. The exact amount can only be given by a quote for the specific route.

Sources

Article author: Mateusz Skotnicki

Author

Mateusz Skotnicki

Deep well drilling expert

I am Mateusz Skotnicki, an enthusiast and specialist in deep well drilling. Welcome to a world where water is not only an essential part of life but also an endless source of inspiration.

Further reading

Next article in this topicWell drilling rig: manual, rented or a drilling company?

Contact

Planning a deep well?

Tell us about your plot and your needs, and we will prepare a free quote for the drilling. Already have a well? We can help with servicing, the pump and water treatment.

Other articles in this topic

Free quote form

We call back within 24 hours

OFERTEO