Planning and costs

Own water source: types of well and formalities

Mateusz Skotnicki , updated 13 min read

Own water source: types of well and formalities. A dug well, a submersible pump and a document

Your own water source is a well or another installation on your plot from which you draw groundwater for the house and garden. You can choose between a deep (drilled) well, a driven (Abyssinian) well, a dug well and a spring intake, and which one suits you is decided by the depth of the water, the intended use and your budget. Legal position as at 16.11.2026. The right to use water on your own land is described in the Polish Water Law Act, consolidated text Dz.U. 2026 poz. 1335: ordinary use of water belongs to the landowner and serves the needs of their household or farm.

Types of own water source: comparison

The four types of intake differ in depth, resistance to drought and the risk of water contamination. The choice depends above all on what the water is for and on the geological conditions on the plot.

Type of intake Where it draws water from Drought Risk of contamination from the surface Best for
Deep well (drilled) from deep aquifers, through a well casing level usually stable lower, because impermeable layers isolate the water a house all year round, including drinking water after testing
Abyssinian well (driven) from shallow groundwater water may disappear in hot weather higher watering, washing, farm uses
Dug well (concrete rings) from the first aquifer, through a shaft of concrete rings water level seasonal higher farm uses, garden
Spring intake from a natural outflow to the surface depends on the spring depends on the surroundings sites where a spring already exists

Costs depend on depth, ground and equipment, so we do not give them in the table. We describe them below and in the price list.

A deep (drilled) well for a single-family house

A deep well is a vertical borehole made with a drilling rig, reaching deep aquifers that are isolated from the surface by layers of till and clay. As a result the water is less exposed to fertilisers and leaks than in shallow wells, and the level usually does not fall as much in a drought.

Depth, yield and water quality depend on the geology of the plot, so they cannot be guaranteed in advance. The full cost includes the borehole, pump, controls, connection, a water test and any treatment. We describe the scope of the borehole on the page about deep well drilling. Prices (net) are in the price list.

If you are torn between drilling and digging, you will find a step-by-step comparison in our article dug well or drilled well.

An Abyssinian well for a garden or a ROD allotment

An Abyssinian well is a thin pipe with a filter point, driven or screwed into the ground to a depth of a few metres. It draws on shallow near-surface groundwater, so it is suitable for watering the garden, washing the car and farm uses, but it is not a good source of drinking water.

Its advantages are speed and simplicity: installation usually takes one day. Its drawback is seasonality. In a summer drought the level of near-surface groundwater falls, and such a well may stop giving water for weeks. It will not do where you need constant pressure for automatic irrigation either. We describe the limitations in detail in our article Abyssinian well: price and limitations.

Additional rules apply on a plot in a family allotment garden (ROD). Before drilling, ask the garden board and check the rules of your garden. Ordinary use of water belongs to the landowner, and an allotment holder is a user, so do not assume that the exemptions in the Water Law Act apply to them automatically. If in doubt, ask Wody Polskie.

A dug (ring) well and its uses

A dug well is a large-diameter shaft lined with concrete rings, reaching the first aquifer. It has a large capacity, because water collects in the whole shaft, and it can be built at a lower cost than a borehole.

Shallow water is, however, more exposed to fertilisers, plant protection products and leaks from septic tanks. For farm uses such a well is often enough. If you are thinking of drinking the water, you need a water test and an assessment of the protection of the intake, and very often treatment too. Formalities are not decided by the name of the type of well, but by the depth, the purpose and the amount of water abstracted.

A spring intake for sites with a natural outflow

A spring intake captures a natural outflow of groundwater at the surface by means of a collecting chamber, from which water flows to the installation. It applies only to plots where a spring actually exists, which is rare and usually in foothill terrain.

If the water flows out under its own pressure, you may be able to manage without a pump. However, you need to assess the yield of the spring in dry months, protect the chamber from the inflow of contamination and test the water. Do not automatically carry over the exemption for constructing a well up to 30 m to building a spring chamber: check the requirements for the specific scope of work with Wody Polskie.

An own water source and the law: permit, notification, legalisation

An own water source for a house usually does not need a water-law permit or a water-law notification, if it stays within the threshold of 30 m depth and 5 m³ of abstraction per day. The Polish Water Law Act treats the two matters separately: constructing the installation and abstracting water are two separate conditions (Article 33 and Article 395).

Constructing a water intake up to 30 m deep for ordinary use of water, and abstraction averaging no more than 5 m³ per day for the needs of your own household or farm, are exempt from a water-law permit and notification (Article 33 and Article 395 of the Water Law Act). These are separate conditions covering the construction of the intake and the abstraction of water. A deeper borehole, or using water beyond ordinary use, requires checking the correct procedure with Wody Polskie. The exemption does not remove location requirements, protection of water intakes or geological regulations. Wody Polskie describe the division into permits, notifications and exemptions in their answers to frequently asked questions.

The limit of 5 m³ per day is calculated as an annual average and concerns the needs of your own household or farm. That is 5,000 litres a day. We describe the full permit procedure, including for deeper boreholes, in our article deep well: permit.

When the water serves a business, it is usually not enough to rely on ordinary use of water, so the procedure has to be checked with Wody Polskie.

If the intake was built without a required permit or notification, it can be legalised with Wody Polskie. The owner of an intake built before 18.08.2026 who submits a complete legalisation application by 31.12.2027 is exempt from the legalisation fee (Article 524a of the Water Law Act). The application and fees are described by Wody Polskie on the page about legalising a water installation. The rules and consequences are covered in our article well legalisation and penalties.

Does an own water source have to be notified to the municipality or district office

The Water Law Act exempts the intake described above from a water-law permit and notification, but there is no single rule for every well. Depending on the depth, the amount of water and the area, geological regulations may also apply, and for other work around the well, construction regulations too.

In terms of construction law, simply building an enclosure for a groundwater intake does not require a building permit or notification (Article 29 section 2 point 25 of the Polish Construction Law). That does not mean that all work around a well is exempt. The Geological and Mining Law (Prawo geologiczne i górnicze) does not apply to excavations and boreholes up to 30 m made to create groundwater intakes for abstraction of up to 5 m³ per day (Article 3 point 2a), so the obligation to prepare documentation and a design does not apply to them. The exceptions are mining areas for medicinal waters and brines.

How a deep well notification works in practice, who accepts it and in which case, is explained in a separate article: deep well notification. It also explains that a water-law notification is accepted by Wody Polskie, not the district office (starostwo). What matters most here is that the requirement depends on the depth, the amount abstracted and the location, not on the name of the type of well.

Distances and protection of the intake

An own water source does not exempt you from location requirements, regardless of depth and type of well. The previous regulation on technical conditions ceased to apply in September 2026 and the new one has not yet been published, so distances from the boundary, the septic tank and buildings are determined with the designer and the district office, based on previous practice and draft regulations.

Do not rely on figures from the internet, because some of them come from the repealed regulation and some from a draft that is not law. Settle the location with the designer and the district office before the crew sets up the drilling rig, and you can read more about the distances themselves in the Help Centre.

When to choose which type of intake

A house where water is to be available every day and all year round usually needs a deep well. Shallower intakes work where the water serves the garden and farm uses, and continuity of supply is not critical.

Situation Type usually chosen Reason
Single-family house, main water source Deep well Stable inflow and lower risk of contamination from the surface
Watering the garden on a plot with mains water Abyssinian well Quick and simple, enough for watering
ROD allotment, watering without electricity Abyssinian well with a hand pump Simple installation, but first check the garden rules
Large garden, house on mains water, limited budget Dug well Large capacity at a lower cost, for farm uses
Foothill terrain with a natural spring Spring intake The water flows out by itself, the chamber has to be protected
Large water demand, farming, business activity Deep well, after checking the procedure with Wody Polskie Abstraction above 5 m³ per day or commercial purposes require a separate procedure

An own water source, mains water and sewage

You can have an own water source alongside mains water, but do not connect the two installations directly, because water from the well could flow back into the mains. Agree how to separate the installations with the local water company and the installer.

A common arrangement is two separate circuits: mains water to the kitchen and bathroom, well water to the garden, washing machine or toilet cistern. Such a split lowers the mains water bills, but its scale depends on how much water you actually move to the well. Your own well also does not remove the charges for sewage discharged to the sewer, because its quantity is determined from measuring devices or from the contract with the water utility (Article 27 sections 4 and 5 of the Act on collective water supply, Dz.U. 2024 poz. 757). The rules for connecting and separating installations are described in the guide well and mains water in the Help Centre.

If you are comparing which pays off better, the calculation is covered in our article well or mains water. This article focuses on the types of intake and the formalities, not on the cost calculation.

How to read the costs of an own water source

The amounts given below are indicative, with a source and a reading date of 16.11.2026, and may change. Include energy, water tests, servicing, treatment and a reserve for replacing equipment. The type of intake alone does not decide which has the lowest cost over 20 years: dug, drilled and spring wells need different outlays on protection, pump and treatment, and a gravity intake also has inspection and maintenance costs.

Item Amount Source
Deep well drilling up to 30 m (ARCHE) PLN 9,000 net ARCHE price list
Each additional metre of borehole (ARCHE) PLN 250 net ARCHE price list
Pump installation (ARCHE) PLN 700 net plus materials ARCHE price list
Electricity about PLN 1.0 - 1.3 gross per kWh, depending on the tariff and the operator electricity price comparison sites, checked on 16.11.2026
Mains water and sewage in Kraków PLN 6.76 plus PLN 8.10 gross per m³ (tariff from 01.02.2026) Wodociągi Miasta Krakowa, checked on 16.11.2026
Water test for a well about PLN 100 - 600 gross, depending on the scope price lists of firms and laboratories, checked on 16.11.2026

The ARCHE price list is marked “net”, while the market prices in the last three rows are gross. When comparing quotes, establish the full amount payable and the scope of materials.

What next

Are you planning your own water source and want to check whether a deep well will work on your plot? Write to us and we will discuss the location, depth and formalities.

Frequently asked questions

Can anyone have their own water source?

Formalities depend on the depth and the abstraction, not on who builds the intake. Constructing an intake up to 30 m deep for ordinary use of water, and abstraction averaging up to 5 m³ per day for the needs of your own household, are exempt from a water-law permit and notification. A deeper borehole or other use of water requires checking the procedure with Wody Polskie.

What is the cheapest own water source?

The Abyssinian well is usually the cheapest, because it is a thin pipe driven into the ground to a depth of a few metres, which can be installed in one day. It does, however, have clear limitations: it can dry up in summer, and water from a shallow layer is not fit to drink without testing and treatment. A dug well usually costs more and gives similar water quality with a larger capacity.

Which own water source is suitable for drinking?

A deep well is usually the safest, because deep aquifers tend to be better isolated from the surface. Water from shallow and spring intakes can also be drinkable after testing and any treatment, but the risk of contamination is higher. The State Sanitary Inspectorate (Sanepid) recommends testing well water before first use and at least once a year, and also after flooding or a failure. The details are in our article on whether water from a deep well is fit to drink.

Does an own water source need a permit?

Not always. Constructing an intake up to 30 m deep for ordinary use of water, and abstraction averaging up to 5 m³ per day for the needs of your own household, are exempt from a water-law permit and notification. For a deeper borehole, larger abstraction or water for business activity, check the procedure with Wody Polskie.

How can you check whether there is water on the plot for an intake?

PIG-PIB hydrogeological maps, data on neighbouring wells and field surveys help to assess the conditions. None of this information confirms in advance a particular depth, quality or yield of the well. Agree the site assessment and the rules for billing the borehole with the contractor.

What about the distance of a well from the boundary and the septic tank?

The previous regulation on technical conditions ceased to apply in September 2026 and the new one has not yet been published. Distances are therefore determined with the designer and the district office, not from a figure found on the internet. Do not treat old values as an obligation.

Sources

Article author: Mateusz Skotnicki

Author

Mateusz Skotnicki

Deep well drilling expert

I am Mateusz Skotnicki, an enthusiast and specialist in deep well drilling. Welcome to a world where water is not only an essential part of life but also an endless source of inspiration.

Further reading

Next article in this topicA well for farming: how much water you need and the formalities in 2026

Contact

Planning a deep well?

Tell us about your plot and your needs, and we will prepare a free quote for the drilling. Already have a well? We can help with servicing, the pump and water treatment.