80 m deep well
A deep well with a depth of 80 metres is an ideal compromise between investment cost and hydraulic performance for owners of single-family homes in Poland. According to the latest market data from 2026, the total cost of building an 80 metre well is PLN 28,650-32,940, and the investment pays for itself on average after 17-32 years when compared with the cost of drawing water from the municipal mains.
Compare the information for other depths: 70 m well, 90 m well. The depth of the borehole is chosen to suit the conditions on your plot.
- High-quality water from the depths
- Gain independence and never worry about running out of water
- Lower costs compared with mains water
How much does an 80 m deep well cost in 2026
At ARCHE, drilling an 80 m deep well costs PLN 21,500 net under the 2026 price list: PLN 9,000 for a borehole up to 30 metres plus PLN 250 for each additional metre (the rate depends on the diameter), i.e. PLN 9,000 + 50 × PLN 250. The price covers drilling, installation of well pipes certified for drinking water, and pumping and cleaning the well. You do not pay for the casing, because we pull it out of the ground once the borehole is finished.
Cost of well equipment
A submersible pump suitable for an 80 metre well costs PLN 4,200-6,500 depending on hydraulic capacity and lift height. For this depth you need a pump with a lift height of at least 90-110 metres (80 m of depth + 10-20 m of working pressure + hydraulic losses in the pipework).
A pressure tank (hydrophore) with a capacity of 100-150 litres costs PLN 750-1,400, and a power cable with a 4×2.5 mm cross-section and a length of 80-90 metres costs PLN 640-930, while a PE32 discharge pipe 32 mm in diameter and 80-90 metres long costs PLN 480-690. A wellhead with a cable gland costs PLN 280-420, and an electrical connection with protection devices costs PLN 800-1,500.
Total cost of a deep well
A complete deep well of 80 metres with full hydraulic and electrical equipment costs PLN 28,650-32,940. The average price for typical geological conditions in Poland is PLN 30,800 including the submersible pump and all accessories.
Calculation of total drilling costs:
| Item | Cost range |
| Borehole with casing and well screen | PLN 21,500 |
| Submersible pump with accessories | PLN 4,200-6,500 |
| Hydraulic and electrical equipment | PLN 2,950-4,940 |
| Total cost | PLN 28,650-32,940 |
80 m deep well
Why use our deep well drilling services?
Top-quality water
The aquifer passes through several filtering layers, which cleans the water effectively.
Lower costs
No more bills for the cubic metres of water you use.
Installation safety
A guaranteed water supply tailored to your needs.
Financial viability of an 80m deep well
An 80m deep well pays for itself after about 17-32 years of use, assuming average water consumption of 150 cubic metres a year for a typical household of four. With higher water use (watering the garden, a swimming pool, a hot tub) the payback period becomes noticeably shorter.
Detailed financial analysis of an 80m deep well:
| Item | Cost / value |
| Initial cost of an 80 m well | PLN 30,800 (average) |
| Annual cost of mains water | PLN 1,800-2,400 |
| Annual running cost of the well | PLN 550-850 |
| Net annual savings | PLN 950-1,850 |
| Payback period | 17-32 years |
When is drilling an 80 metre well worth it?
An 80m deep well is clearly a worthwhile investment in the following situations: an 80 metre deep well is clearly worthwhile where there is no access to the mains water network, where the cost of a connection exceeds PLN 20,000, where water consumption is high at over 200 cubic metres a year, where intensive garden watering requires an additional 100-300 cubic metres a year, and where building a water connection is expensive because the property is more than 150 metres from the network.
An 80m well is also worth considering with average water consumption of 100-200 cubic metres a year, with mains water more than 100 metres from the plot, and with planned growth in water use from building a swimming pool or extending the garden, where the stability of a deep water source guarantees a continuous supply.
Cost comparison: 80 metre well vs mains water for a detached house
An 80m deep well versus mains water. Detailed financial analysis over 10 years of use:
| Comparison criterion | 80m well | Mains water |
| Initial cost | PLN 30,800 | PLN 8,000-20,000* |
| Annual running cost | PLN 550-850 | PLN 2,000 |
| Total 10-year cost | PLN 36,300-39,300 | PLN 28,000-40,000 |
| Independence from the supplier | Full autonomy | No independence |
| Water quality | Natural mineralisation | Chlorinated and fluoridated |
| Availability during outages | Continuous | Supply interruptions |
Technical characteristics of an 80m well
Hydraulic parameters and yield
An 80m deep well achieves a hydraulic yield of 1500-4000 litres per hour, depending on local hydrogeological conditions. The static water table is usually found at a depth of 40-60 metres below ground level.
Detailed technical characteristics of an 80m well:
Total borehole depth is 80 metres
Nominal borehole diameter: 150-200 millimetres
Casing diameter: PVC 125 millimetres
Length of the screen zone: 12-18 metres
Operating yield: 1.5-4.0 cubic metres per hour
Detailed pump parameters for the well
A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a lift of 90-110 metres is the optimal solution for an 80-metre well. The electrical power of the pump should be 1.5-2.2 kilowatts at a supply voltage of 230 volts. The nominal diameter is 4 inches (100 millimetres), and the purchase cost is PLN 4,200-6,500.
Free quote for an 80 m deep well
Fill in our deep well quote form, or contact us by email or phone.
Water quality from an 80m deep well
Physicochemical parameters of water from a depth of 80m
Water drawn from an 80-metre well is of exceptionally high microbiological quality thanks to natural filtration through even thicker and more varied geological layers. The total hardness of water at this depth averages 12-18 German degrees, and the pH stays within a stable range of 7.0-7.8 pH units.
Typical physicochemical parameters of water from an 80m well:
| Parameter | Range of values | Limit | Status |
| Total hardness | 12-18 °dH | no limit | hard |
| pH | 7.0-7.8 | 6.5-9.5 | within limit |
| Iron | 1.8-7.5 mg/l | 0.2 mg/l | above limit |
| Manganese | 0.1-0.7 mg/l | 0.05 mg/l | above limit |
| Pathogenic bacteria | absent | absent | within limit |
| Nitrates | <5 mg/l | 50 mg/l | within limit |
Water treatment systems for an 80m well
An iron and manganese removal system is the treatment system most often required for water drawn from 80-metre wells, where mineral concentrations can be somewhat higher than in shallow water sources. A complete system costs PLN 5,200-10,500 for a capacity suited to supplying a household.
Ion-exchange water softeners are also available for PLN 3,500-6,800, effectively reducing water hardness, as are UV disinfection lamps for PLN 850-1,600 that eliminate bacteria and viruses (although at 80 metres the microbiological risk is minimal).
Permits for an 80m deep well
What permits are required to drill an 80m well?
Under the Water Law Act (Prawo wodne) (Articles 33 and 395), constructing a water intake up to 30 m deep for ordinary water use and abstracting on average no more than 5 m³ per day for your own household or farm are exempt from a water-law permit and a water-law notification. An 80 m deep well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling.
These are separate conditions: one concerns constructing the intake, the other abstracting the water. A deeper borehole, or using water beyond ordinary use, requires checking the applicable procedure with Wody Polskie.
Formalities for an 80 m well
Because the borehole for an 80-metre well is deeper than 30 m, the applicable procedure and required documents must be checked with Wody Polskie before work starts. Siting requirements, source protection rules and geological regulations also apply, so before drilling we check the well location and the minimum distances listed below.
Minimum distances of an 80m well from other structures
Required distances of an 80-metre well from various structures on the plot, in accordance with the Minister of Health regulation on the quality of water intended for human consumption:
| Structure / boundary | Minimum distance of the well |
| Boundary of the neighbouring plot | 5 m |
| Residential and farm buildings | 15 m |
| Liquid waste tanks | 30 m |
| Domestic wastewater treatment plants | 50 m |
| Septic tanks and absorption trenches | 70 m |
The well-building process step by step
Stage one: geological surveys and siting
Geophysical surveys using electrical resistivity tomography before drilling a well cost PLN 2,200-3,200 per 400-metre profile and make it possible to determine the optimal location of the well and its expected hydraulic yield to within 90-95 percent. At a depth of 80 metres, a precise survey is crucial for avoiding dry boreholes. The alternative is to analyse the PIG (Polish Geological Institute) hydrogeological maps for PLN 300-600, or to observe indicator vegetation, which is free.
Stage two: drilling the 80-metre borehole
Drilling a deep well takes 10-16 working hours in standard ground conditions in Poland. A truck-mounted drilling rig with a power of 150-200 hp drills a borehole 150-200 millimetres in diameter at an average speed of 3-5 metres per hour (the rate falls as depth increases). The complete process includes setting up the drilling site in 1 hour, the drilling itself in 10-16 hours, installing the casing string in 4-6 hours and developing the well with pumps, which takes 2-3 hours.
Stage three: installing the electrical equipment
Installing a submersible pump in an 80m well requires a YKYY 4×2.5mm cable 85 metres long (80m of depth + 5m of technical reserve). The pump is placed at an operating depth of 25-35 metres below ground level (depending on the dynamic water level). Installing the pump system includes placing the pump at a depth of 25-35 metres, routing the power cables through a sealed wellhead, installing a pressure tank (hydrophore) in the building or in a water meter chamber, and connecting to the household water supply system.
Maintenance and operation of an 80m well
Inspection schedule for an 80-metre well
A technical inspection of an 80m well should take place every 6 calendar months, covering a check of the water table level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400, including consumables.
Maintaining an 80m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 7-11 years (because it works under the greater load of the water column).
Annual running costs of an 80 metre deep well
Running an 80 metre well costs PLN 550-850 a year for a standard household of four using 150 cubic metres of water. The pump uses 1.4-2.0 kilowatt-hours of electricity per cubic metre of water produced, which results from the need to overcome a greater lift.
The annual running costs of an 80m well consist of electricity for the pump at PLN 300-450, maintenance and technical inspections at PLN 200-300 and minor repairs and replacement parts at PLN 50-100, giving a total annual cost of PLN 550-850.
Book a well drilling date
We build deep wells in every type of ground! Deep well drilling has been our passion since 2019! Get in touch and find out the cost of building a deep well!
Comparison of an 80m deep well with other depths
Comparative analysis with depths of 30m, 60m and 80m
The table below shows how borehole depth affects initial costs, formal requirements and the real payback time on the investment in 2026.
| Depth | Construction cost (borehole) | Water-law permit | Yield | Payback |
| 30 metres | PLN 9,000 | Not required | 1,400-3,700 L/h | 8-15 years |
| 60 metres | PLN 16,500 | To be checked with Wody Polskie | 1,900-4,600 L/h | 12-23 years |
| 80 metres | PLN 21,500 | To be checked with Wody Polskie | 1,500-4,000 L/h | 17-32 years |
Maintenance and operation of an 80m well
Inspection schedule for an 80-metre well
A technical inspection of an 80m well should take place every 6 calendar months, covering a check of the water table level, the pressure in the pressure tank system and the electrical parameters of the pump. The annual cost of maintenance and minor repairs is PLN 250-400, including consumables.
Maintaining an 80m well requires checking the water level and pump parameters every 6 months, disinfecting the well with chlorine once a year in line with PZH standards, analysing water quality in an accredited laboratory every 2 years, and replacing the submersible pump with a new one every 7-11 years (because it works under the greater hydrostatic load).
Annual running costs of an 80 metre deep well
Running an 80m well costs PLN 550-850 a year for a standard household of four using 150 cubic metres of water. The pump uses 1.4-2.0 kilowatt-hours of electricity per cubic metre of water produced, which is a direct result of the greater pumping depth.
The annual running costs of an 80m well consist of electricity for the pump at PLN 300-450, maintenance and technical inspections at PLN 200-300 and minor repairs and replacement parts at PLN 50-100, giving a total annual cost of PLN 550-850.
What does the well drilling price include?
The overall price for drilling a deep well is calculated according to the rate – per metre of borehole – and depends on the depth of the hole to be drilled.
The cost of such a well depends on several parameters. Remember that the cost may also vary with the location where the deep well drilling takes place.
When drilling a well, the price is affected by:
- the depth of the drilled well
- the diameter of the well casing
- the type of slotted well screen
When installing and equipping the well, the price is affected by:
– the type of well enclosure
– the type of submersible pump
– the type of pumping set installation
– the size of the pressure tank (hydrophore)
– the type of wellhead
– the number of concrete rings
– the type of pump, pressure tank and pressure switch
– the length of the pipeline bringing water to the house
– the depth of the trench, the pressure line trench and the power supply
In most cases the company can only give a price for the service after talking to the customer. A borehole up to 30 metres costs PLN 9,000 net, and each additional metre PLN 250 net (depending on the diameter).
Keep in mind that the cost of drilling a well sometimes includes the cost of the pipes. It is therefore worth checking whether this is the reason for an inflated price. A higher price should be justified: as we mentioned above, the reason is often simply the need to drill a wider hole or to use a more expensive drilling method because of the geological conditions.
Under the ARCHE price list, drilling an 80 m deep well costs PLN 21,500 net. On top of the borehole you need to budget for a submersible pump with fittings and its installation (PLN 700 net + materials under the ARCHE price list).
|
Service name (borehole): |
Price from (net): |
|
Deep well 110Φ |
PLN 250 per metre * |
|
Deep well 125Φ |
PLN 250 per metre * |
80 m deep well

Well for your home
Drilling a deep well is currently the best way to get free, clean water in your home.

Well for businesses
Wells for industry and commerce are a fairly popular solution, especially for car washes, swimming pools, thermal baths, spas and agritourism businesses.

Well for agriculture
Industrial pumps that can move hundreds of metres of water per hour.
How do we drill a well?
Step by step to your deep well in Katowice

1. Free quote
We discuss the borehole, the location and the way it will be carried out

2. Choosing the pump
Choosing the pump and accessories

3. Choosing the location
We decide where on your plot the water will be drawn

4. Drilling the well
The well is drilled on the date you choose.
Book a date for drilling your well
We drill with specialist equipment, the Rotomax XL GT.
With us you get a guarantee of quality.
Reviews
Find an answer
Answers to the questions our customers ask most often
A complete 80m deep well costs PLN 28,650-32,940 (including drilling at PLN 21,500 net under the ARCHE price list), depending on the geological conditions of the site and the technical equipment chosen.
An 80 metre well is deeper than 30 m, so the applicable procedure must be checked with Wody Polskie before drilling. The exemption from a water-law permit and notification covers constructing an intake up to 30 m deep for ordinary water use.
A 4-inch submersible pump with a capacity of 1.5-3.0 cubic metres per hour and a lift of 90-110 metres of water column. The pump power should be 1.5-2.2 kilowatts. The purchase cost of a submersible pump is PLN 4,200-6,500.
An 80m well pays for itself after 17-32 years of use with average water consumption of 150 cubic metres a year. A household saves PLN 950-1,850 a year compared with the cost of mains water.
An 80m deep well produces 1,500-4,000 litres per hour, depending on local hydrogeological conditions. That equates to 36-96 cubic metres per day: enough for any household.
Drilling an 80m well takes 1-2 working days. The rotary drilling itself takes 10-16 hours, and the complete installation with electrical equipment takes 2-3 working days.
The water is drinkable but may need treatment. It often contains excess iron (1.8-7.5 mg/l against a standard of 0.2 mg/l) and is hard (12-18°dH). An iron removal system costs PLN 5,200-10,500.
The required minimum distances are 5 metres from the plot boundary, 15 metres from residential buildings, 30 metres from waste tanks and 50 metres from domestic wastewater treatment plants.
The annual running cost is PLN 550-850 and covers electricity for the pump (PLN 300-450), technical maintenance (PLN 200-300) and minor repairs (PLN 50-100).
Wells can be drilled all year round. In winter work can take slightly longer because of the frozen surface layer of the ground, but modern drilling equipment copes with difficult weather conditions.
Check the technical condition of the pump and the well screens. Flushing the well with pumps often helps.
The water is of high microbiological quality thanks to natural geological filtration. Typical parameters for the water are hardness of 12-18°dH, pH 7.0-7.8 and iron 1.8-7.5 mg/l. It usually requires an iron removal system.
How much does a deep well cost? Write to us or call
Drilling tips
Read the latest posts on our blog. Gather the knowledge you need before choosing the best option for you.