Planning and costs

Deep well subsidies in 2026: Moja Woda, municipalities and farmers

Mateusz Skotnicki , updated 4 min read

Dofinansowanie do studni głębinowej w 2026 roku

There is no nationwide subsidy for a deep well in 2026: no national programme pays towards building a private well. The popular Moja Woda programme, called Mikroretencja this year, funds collecting and using rainwater, not abstracting groundwater. A subsidy for a well is sometimes offered by a municipality (gmina), on the basis of its own resolution and only during an announced call for applications. Farmers can look for irrigation support in ARiMR programmes.

Moja Woda 2026 (Mikroretencja): what it covers

Summary: Mikroretencja (Moja Woda) 2026, municipal programmes and ARiMR support, what they cover and whether they apply to wells
As of 09.10.2026. Conditions change with each new call for applications.

According to the National Fund for Environmental Protection and Water Management, the programme supports owners and users of single-family houses with rainwater retention. The main conditions of the 2026 edition:

Condition Value
What for Installations for collecting, storing, retaining in the ground and using rainwater and meltwater
Maximum subsidy PLN 8000, up to 90% of eligible costs
Minimum project cost PLN 2000
Minimum tank capacity 2 m³
Call for applications At the voivodeship funds, from 22.06.2026
Eligible costs Incurred from 01.07.2024

Applications are submitted to the voivodeship fund responsible for the location of the project: in Lesser Poland (Małopolska) that is WFOŚiGW in Kraków, and in Silesia WFOŚiGW in Katowice. The programme’s budget is sometimes used up quickly, so it is worth checking the status of the call before you buy.

Will Moja Woda subsidise a deep well?

No. A deep well draws groundwater, while the programme concerns rainwater. The borehole, the submersible pump and the treatment of well water are not eligible costs. A well can, however, work nicely alongside a rainwater system: a rainwater tank supplies watering during rainy periods, and the well tops up the water in a drought. How to combine both sources in a garden is covered in our article on a well for watering the garden.

Municipal subsidy for a well

Some municipalities, especially where there is no water mains, adopt resolutions on grants for building wells. An example from 2026 is the Krempna municipality, which in March accepted applications for a grant of up to 80% of costs, no more than PLN 8000.

Such programmes are not widespread, and their legal basis is sometimes challenged by the regional audit chambers. Each municipality sets the rules separately: who can apply, whether a house without access to mains water counts, which documents are needed and when the settlement is due. Before you sign a contract with a contractor, ask at the municipal office (urząd gminy) whether such a call is planned. A common condition is that the application must be submitted before work starts.

Farmers: irrigation support

Farmers can use ARiMR calls for investments in farm irrigation, of which a water source is sometimes a component. ARiMR describes example investments and current calls. For agricultural abstraction, remember the limit on ordinary use of water and a possible water-law permit. We write more in our article on a well for agriculture.

How to cost a well without a subsidy

Even without a subsidy, a well can pay off, especially with high garden water use or far from the network. The cost at ARCHE: borehole up to 30 m PLN 9000 net, each further metre PLN 250 net, connection PLN 1500 net plus materials (price list). We describe the comparison with mains water in our article on how much a water connection costs, and the return on investment in our article on the profitability of a well.

Frequently asked questions

Is there a subsidy for a deep well in 2026?

There is no nationwide programme. Some municipalities give grants on the basis of their own resolutions, and farmers can use ARiMR calls for irrigation.

Does Moja Woda 2026 cover a well?

No. The Mikroretencja (Moja Woda) programme concerns collecting and using rainwater. The borehole and the submersible pump are not eligible costs.

How much can you get from Moja Woda 2026?

Up to PLN 8000, a maximum of 90% of eligible costs, with a minimum cost of PLN 2000 and tank capacity of at least 2 m³.

Where do I apply for a municipal well grant?

At the municipal office, within the announced call period. The conditions are set by the resolution of the given municipality, and the application often has to be submitted before work starts.

Sources

Have you checked the programmes in your municipality and want to cost a well? Order a quote or call: +48 784 038 407.

Article author: Mateusz Skotnicki

Author

Mateusz Skotnicki

Deep well drilling expert

I am Mateusz Skotnicki, an enthusiast and specialist in deep well drilling. Welcome to a world where water is not only an essential part of life but also an endless source of inspiration.

Further reading

Next article in this topicWell drilling cost per metre: what goes into the quote

Contact

Planning a deep well?

Tell us about your plot and your needs, and we will prepare a free quote for the drilling. Already have a well? We can help with servicing, the pump and water treatment.

Other articles in this topic

Free quote form

We call back within 24 hours

OFERTEO