{"id":7840,"date":"2026-06-14T20:39:57","date_gmt":"2026-06-14T18:39:57","guid":{"rendered":"https:\/\/studniaglebinowa.eu\/deep-wells\/how-long-deep-well-drilling-takes\/"},"modified":"2026-11-16T22:13:15","modified_gmt":"2026-11-16T21:13:15","slug":"how-long-deep-well-drilling-takes","status":"publish","type":"post","link":"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/how-long-deep-well-drilling-takes\/","title":{"rendered":"How long does it take to drill a deep well? Timescales and scheduling"},"content":{"rendered":"<p>How long does it take to drill a deep well? A borehole of up to 30 m, including installing the pipes and clearing by pumping, usually takes 1 &#45; 2 working days, or 8 &#45; 16 hours of crew time. With the pump, pressure tank and house connection installed, the whole job takes 2 &#45; 3 days. That is the time spent on site. On top of it come the formalities and the wait for a free slot with the crew, which often take longer than the drilling itself.<\/p>\n<h2>How long it takes to drill a deep well, step by step<\/h2>\n<p>In short: 12 &#45; 24 hours of work from the arrival of the drilling rig to the first turn of a tap. The times below apply to a typical 25 &#45; 35 m well in sandy or clay ground. In rock, every stage, and especially the drilling itself, takes longer.<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Typical time<\/th>\n<th>What it depends on<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Setting up the site<\/td>\n<td>1 &#45; 2 h<\/td>\n<td>getting to the plot, levelling the drilling rig, marking the spot<\/td>\n<\/tr>\n<tr>\n<td>Drilling the borehole<\/td>\n<td>4 &#45; 8 h in sand and clay, 8 &#45; 16 h in rock<\/td>\n<td>type of ground and depth<\/td>\n<\/tr>\n<tr>\n<td>Installing the well pipes and gravel pack<\/td>\n<td>2 &#45; 3 h<\/td>\n<td>pipe diameter, screen depth<\/td>\n<\/tr>\n<tr>\n<td>Clearing and test pumping<\/td>\n<td>1 &#45; 3 h<\/td>\n<td>silting of the borehole, yield of the aquifer<\/td>\n<\/tr>\n<tr>\n<td>Installing the submersible pump and wellhead<\/td>\n<td>2 &#45; 4 h<\/td>\n<td>pump type, hanging depth<\/td>\n<\/tr>\n<tr>\n<td>Installing the pressure tank and the house connection<\/td>\n<td>2 &#45; 4 h<\/td>\n<td>length of the route, condition of the ground for the trench<\/td>\n<\/tr>\n<tr>\n<td>Total (30 m well)<\/td>\n<td>12 &#45; 24 h, that is, 2 &#45; 3 days<\/td>\n<td>from the crew&#8217;s arrival to the first water at the tap<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>The times are indicative and apply to typical conditions. The exact schedule depends on the plot and the scope of work.<\/p>\n<p>What happens at each stage? ARCHE drills using the percussion method. Once the hole is drilled, PVC-U well pipes of 125 mm are lowered in (110 mm with a thicker gravel pack in sandy ground), and the casing is pulled out. A filter gravel pack is placed around the screen. Then comes clearing and test pumping: the water from the borehole clears gradually, and the yield measurement shows which pump to choose. You will find a detailed description of each stage in the guide <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/building-a-well-step-by-step\/\">building a deep well step by step<\/a>, and we describe the installation of the equipment in the article on <a href=\"https:\/\/studniaglebinowa.eu\/studnia-glebinowa\/montaz-pompy-glebinowej\/\">submersible pump installation<\/a>.<\/p>\n<h2>How the ground affects drilling time<\/h2>\n<p>Drilling time depends above all on the ground, because its hardness cannot be changed. Drilling is fastest in sand and gravel, slower in clay, and slowest in limestone, sandstone or granite. A 30 m well that takes part of a day in sand may take a whole day in rock, and in difficult ground even 2 &#45; 3 days.<\/p>\n<p>Hence a simple rule: the deeper the well and the harder the ground, the longer it takes. A 50 m borehole in difficult terrain can take 3 &#45; 4 days. We write about the depth that usually has to be drilled in your area in the article on well depth, and before drilling, ask the contractor how they charge for difficult ground. We do not describe drilling methods in detail here, because that is the subject of the guide to <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/deep-well-drilling-stages-cost\/\">drilling a deep well<\/a>.<\/p>\n<h2>Seasonality: the best time of year to drill a well<\/h2>\n<p>A drilling rig works all year round, but the time of year changes the wait for a crew and the conditions for finishing the installation. At the spring peak you usually wait 2 &#45; 4 weeks for a free slot, in autumn 1 &#45; 2 weeks, and in winter often less than a week. The times given are typical for the market, and the specific date is agreed with the contractor at first contact.<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th>Season<\/th>\n<th>Wait for a crew<\/th>\n<th>Advantages<\/th>\n<th>Disadvantages<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Spring (March &#45; May)<\/td>\n<td>2 &#45; 4 weeks<\/td>\n<td>thawed ground, high water levels after the snowmelt<\/td>\n<td>companies are busy, few flexible dates<\/td>\n<\/tr>\n<tr>\n<td>Summer (June &#45; August)<\/td>\n<td>1 &#45; 3 weeks<\/td>\n<td>dry ground, good access<\/td>\n<td>companies are busy, low water levels during a drought<\/td>\n<\/tr>\n<tr>\n<td>Autumn (September &#45; November)<\/td>\n<td>1 &#45; 2 weeks<\/td>\n<td>shorter queues, ground not yet frozen<\/td>\n<td>risk of the first frosts towards the end of the season<\/td>\n<\/tr>\n<tr>\n<td>Winter (December &#45; February)<\/td>\n<td>less than a week<\/td>\n<td>the shortest wait<\/td>\n<td>frozen ground makes the trench for the service line harder to dig<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>In spring, after the snowmelt, water levels are high, so it is easier to judge the well&#8217;s yield. In an August drought the same borehole may show a lower yield, although it usually returns to normal once water levels recover.<\/p>\n<p>In winter, the drilling itself is no different from summer. The trouble starts with the trench for the pipe to the house: frozen ground is harder to dig, and the pipe must lie below the frost line, the values for which in Lesser Poland and Silesia we give in the article on <a href=\"https:\/\/studniaglebinowa.eu\/studnia-glebinowa\/glebokosc-przemarzania-gruntu\/\">frost depth in the ground<\/a>. That is why, for a winter order, the borehole is drilled straight away, and the service line and the enclosure are finished in spring.<\/p>\n<h2>What makes well drilling take longer<\/h2>\n<p>The most common reasons for delay are hard ground, no water at the planned depth, difficult access and equipment failure. Each of them usually adds anything from a few hours to 1 &#45; 2 days.<\/p>\n<p>Rock or hard ground is the most common reason for overrunning the plan. The contractor should say straight away that they have hit rock, and propose either moving the location or drilling further.<\/p>\n<p>If at the planned depth the aquifer is dry or its yield is too low, drilling takes longer by the time needed to drill further metres or change the location. In the ARCHE price list, each additional metre of borehole is PLN 250 net, and a dry borehole with no water is PLN 150 net per metre. The full price list is on the page <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-well-price-list\/\">deep well price list<\/a>, and we cover the subject in the guide <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/well-drilling-cost-per-metre\/\">well drilling cost per metre<\/a>.<\/p>\n<p>Difficult access means a narrow entrance, boggy ground or a steep embankment. A heavy drilling rig needs a firm road, so it sometimes has to be prepared first. What to check on the plot before the crew arrives is described in <a href=\"https:\/\/studniaglebinowa.eu\/en\/help\/plot-preparation\/\">preparing the plot for drilling<\/a>.<\/p>\n<p>Artesian water, that is, water that flows out of the borehole by itself under pressure, is rare in Poland. When it does appear, it requires sealing the wellhead and extra time for controlled capture of the water.<\/p>\n<p>Equipment failure is rare, but a drilling rig is a machine, so with a longer repair the job may slip by 1 &#45; 2 days.<\/p>\n<h2>How much time from decision to a finished well<\/h2>\n<p>From the decision to the first water, time passes for formalities, waiting for a crew, preparing the plot, the drilling itself and testing the water. The longest part is usually the wait for a slot, not the work itself.<\/p>\n<p>Legal position as at 16.11.2026. Constructing an intake up to 30 m deep for ordinary use of water, and abstraction averaging no more than 5 m\u00b3 per day for the needs of your own household or farm, are exempt from a water-law permit and notification (Articles 33 and 395 of the <a href=\"https:\/\/api.sejm.gov.pl\/eli\/acts\/DU\/2026\/1335\" target=\"_blank\" rel=\"noopener\">Water Law Act<\/a>). These are separate conditions concerning the construction of the intake and the abstraction of water. A deeper borehole, or using the water beyond ordinary use, requires checking the correct procedure with Wody Polskie. The exemption does not remove location requirements, the protection of intakes or geological regulations, and for boreholes up to 30 m and abstraction up to 5 m\u00b3 per day the <a href=\"https:\/\/api.sejm.gov.pl\/eli\/acts\/DU\/2026\/69\" target=\"_blank\" rel=\"noopener\">Geological and Mining Law<\/a> (Prawo geologiczne i g\u00f3rnicze) has its own exclusions, subject to mining areas for medicinal waters and brines. We describe the scope of formalities for your plot in the article on <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/deep-well-permit-and-notification\/\">whether a deep well needs a permit<\/a>.<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Indicative time<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Formalities, if needed<\/td>\n<td>depends on the procedure at the office, no single figure can be given<\/td>\n<\/tr>\n<tr>\n<td>Waiting for a crew slot<\/td>\n<td>from less than a week in winter to 2 &#45; 4 weeks in spring<\/td>\n<\/tr>\n<tr>\n<td>Preparing the plot and access<\/td>\n<td>usually during the wait for the crew<\/td>\n<\/tr>\n<tr>\n<td>Drilling, installing the pump and the service line<\/td>\n<td>2 &#45; 3 working days<\/td>\n<\/tr>\n<tr>\n<td>Water test after the well is built<\/td>\n<td>the laboratory gives the time<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>After pumping, it is worth planning a <a href=\"https:\/\/studniaglebinowa.eu\/en\/deep-wells\/well-water-testing\/\">well water test<\/a>, because the result shows whether the water needs treatment. Agree the date of drilling after checking the documentation and the access. If you want to know how the service works from the inside, see the page on <a href=\"https:\/\/studniaglebinowa.eu\/studnie-glebinowe\/odwiert-studni\/\">deep well drilling<\/a> in the ARCHE offer.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>How long does it take to dig a deep well?<\/h3>\n<p>A deep well is not dug but drilled, and the drilling itself up to 30 m, with pipe installation and clearing by pumping, takes 1 &#45; 2 working days. A complete job with the pump and service line is 2 &#45; 3 days. A 50 m well in difficult ground can take 3 &#45; 4 days. Dug wells, that is, concrete ring wells, are built differently and take longer, but that is a separate subject.<\/p>\n<h3>How long does it take to drill a 30 metre well?<\/h3>\n<p>In typical sandy or clay ground, drilling the hole itself takes 4 &#45; 8 hours. To that you add installing the pipes (2 &#45; 3 h), clearing by pumping (1 &#45; 3 h) and installing the pump with the wellhead (2 &#45; 4 h). The pressure tank and the house connection are usually a few more hours of the installer&#8217;s work. In total, the crew is on site for 2 &#45; 3 days.<\/p>\n<h3>When is the best time to order well drilling?<\/h3>\n<p>Autumn is the most convenient: waiting times are shorter than in spring, and the ground is not yet freezing, so the service line can be finished straight away. In winter a free slot is found fastest, but frozen ground makes the trench harder to dig. Spring is the most popular and involves the longest wait.<\/p>\n<h3>Can a well be drilled in winter?<\/h3>\n<p>Yes, a drilling rig works all year round. The borehole itself looks the same in winter as in summer, and the problem is the trench for the pipe to the house in frozen ground. So the borehole is often drilled in winter, and the pressure tank and service line once the ground has thawed.<\/p>\n<h3>What delays drilling a deep well?<\/h3>\n<p>Most often rock or hard ground, no water at the planned depth and difficult access for the drilling rig. In rock, drilling that takes part of a day in sand can take a whole day or longer. Equipment failure and artesian water, which needs extra sealing, have a smaller effect.<\/p>\n<h3>Can I be present during drilling?<\/h3>\n<p>Yes, it is even recommended. You can watch what kind of ground comes out of the borehole, confirm the position of the wellhead and discuss the location of the pressure tank with the crew. You do not need to stand by the machine the whole time, it is enough to be on the plot and reachable by phone, and at acceptance to check the depth and the borehole parameters.<\/p>\n<h2>Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/api.sejm.gov.pl\/eli\/acts\/DU\/2026\/1335\" target=\"_blank\" rel=\"noopener\">Prawo wodne, consolidated text, Dz.U. 2026 poz. 1335: Article 33 (ordinary use of water) and Article 395 (exemptions from permit and notification)<\/a><\/li>\n<li><a href=\"https:\/\/api.sejm.gov.pl\/eli\/acts\/DU\/2026\/69\" target=\"_blank\" rel=\"noopener\">Prawo geologiczne i g\u00f3rnicze, consolidated text, Dz.U. 2026 poz. 69: Article 3 point 2a (exclusion for boreholes up to 30 m and abstraction up to 5 m\u00b3 per day)<\/a><\/li>\n<li><a href=\"https:\/\/www.gov.pl\/web\/wody-polskie\/legalizacja-urzadzenia-wodnego\" target=\"_blank\" rel=\"noopener\">Wody Polskie: legalizacja urz\u0105dzenia wodnego (official information on the procedure and fees)<\/a><\/li>\n<\/ul>\n<p>Planning a borehole and want to set a date? <a href=\"https:\/\/studniaglebinowa.eu\/en\/contact-a-well-expert\/\">Write to us<\/a> or call: +48 784 038 407. We will check the plot and the access and choose a date for the work.<\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-center kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;center&quot;,&quot;id&quot;:&quot;7840&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;0&quot;,&quot;title&quot;:&quot;How long does it take to drill a deep well? Timescales and scheduling&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 0px;\">\n            <span class=\"kksr-muted\"><\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>How long does it take to drill a deep well? A borehole up to 30 m takes 1 to 2 days, with pump and service line 2 to 3. Stages, seasons and delays.<\/p>\n","protected":false},"author":5,"featured_media":10260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[149],"tags":[],"class_list":["post-7840","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-deep-wells"],"_links":{"self":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/posts\/7840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/comments?post=7840"}],"version-history":[{"count":9,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/posts\/7840\/revisions"}],"predecessor-version":[{"id":10540,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/posts\/7840\/revisions\/10540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/media\/10260"}],"wp:attachment":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/media?parent=7840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/categories?post=7840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/tags?post=7840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}