{"id":7747,"date":"2026-02-01T21:14:15","date_gmt":"2026-02-01T20:14:15","guid":{"rendered":"https:\/\/studniaglebinowa.eu\/terms-of-service\/"},"modified":"2026-10-14T10:56:15","modified_gmt":"2026-10-14T08:56:15","slug":"terms-of-service","status":"publish","type":"page","link":"https:\/\/studniaglebinowa.eu\/en\/terms-of-service\/","title":{"rendered":"TERMS AND CONDITIONS FOR DEEP WELL DRILLING SERVICES"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">TERMS OF SERVICE FOR DEEP WELL DRILLING SERVICES<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">of 02.05.2023<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 1. GENERAL PROVISIONS<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>These Terms of Service set out the rules, scope and conditions for the provision of deep well drilling services by Arche S.C. (studniaglebinowa.eu) (hereinafter the \u201cContractor\u201d).<\/li>\n\n\n\n<li>By placing an order for the drilling of a deep well borehole, the Client confirms that they have read these Terms of Service and accepts all of their provisions without reservation.<\/li>\n\n\n\n<li>The Terms of Service form an integral part of the contract concluded between the Contractor and the Client.<\/li>\n\n\n\n<li>The Client is obliged to read these Terms of Service before placing an order. The Contractor ensures that the Terms of Service are available on the website and, at the Client&#8217;s request, in paper form.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 2. DEFINITIONS<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For the purposes of these Terms of Service, the following definitions apply:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Contractor<\/strong>: the company Arche S.C. (studniaglebinowa.eu), which provides deep well drilling services.<\/li>\n\n\n\n<li><strong>Client<\/strong>: a natural person, a legal person or an organisational unit without legal personality that commissions the Contractor to drill a deep well borehole.<\/li>\n\n\n\n<li><strong>Borehole<\/strong>: the process of mechanically drilling through the ground to a specified depth in order to reach an aquifer.<\/li>\n\n\n\n<li><strong>Deep well<\/strong>: a structure consisting of a borehole, well casing, a gravel pack and a well enclosure, used to abstract groundwater.<\/li>\n\n\n\n<li><strong>Aquifer<\/strong>: a natural geological formation containing groundwater.<\/li>\n\n\n\n<li><strong>Well yield<\/strong>: the quantity of water that can be drawn from the well per unit of time, expressed in m\u00b3\/h or l\/min.<\/li>\n\n\n\n<li><strong>Completion Report<\/strong>: a document confirming that the service has been performed, containing the technical parameters of the borehole drilled.<\/li>\n\n\n\n<li><strong>Dry borehole (negative result)<\/strong>: a borehole drilled in accordance with good drilling practice which, for reasons lying in the geological and hydrogeological conditions of the site, has not reached groundwater or has reached water in a quantity insufficient for use.<\/li>\n\n\n\n<li><strong>Free flow (artesian flow) <\/strong>: a phenomenon in which water flows by itself to the ground surface from the borehole of a deep well, caused by the natural hydrostatic pressure in the aquifer; it is a natural phenomenon, independent of the way the borehole was drilled.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 3. SCOPE OF SERVICES<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>The Contractor provides comprehensive deep well drilling services, including:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Drilling the deep well borehole<\/li>\n\n\n\n<li>Installing the well casing<\/li>\n\n\n\n<li>Placing the gravel pack<\/li>\n\n\n\n<li>A pumping test to determine the well yield<\/li>\n\n\n\n<li>Issuing a report of the work performed<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The Contractor uses modern, state-of-the-art drilling equipment, which ensures high quality and speed of execution of the service.<\/li>\n\n\n\n<li>The scope of additional services (e.g. pump installation, water connections, water quality tests) is agreed individually in the contract.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 4. RULES FOR PERFORMING THE ORDER<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Performance of the service begins after:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The Client has accepted the offer<\/li>\n\n\n\n<li>An advance payment has been made (if required)<\/li>\n\n\n\n<li>The Client has provided access for the drilling equipment<\/li>\n\n\n\n<li>The Client has indicated the place where the borehole is to be drilled<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The Client is obliged to:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Provide access to the plot and to the place where the borehole is to be drilled<\/li>\n\n\n\n<li>Provide access to utilities (electricity, if required)<\/li>\n\n\n\n<li>Obtain all necessary permits and consents required by law<\/li>\n\n\n\n<li>Indicate the location of underground installations (cables, pipes, etc.)<\/li>\n\n\n\n<li>Inform the Contractor of all significant circumstances concerning the plot<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The deadline for performing the service is agreed individually and may change in the event of:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Unfavourable weather conditions<\/li>\n\n\n\n<li>Unforeseen difficult geological conditions<\/li>\n\n\n\n<li>Equipment failure<\/li>\n\n\n\n<li>Other causes beyond the Contractor&#8217;s control<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>After the work is completed, the Contractor issues a Completion Report containing:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The depth of the borehole<\/li>\n\n\n\n<li>The diameter of the borehole<\/li>\n\n\n\n<li>The type and quantity of materials used<\/li>\n\n\n\n<li>The well yield established during the pumping test<\/li>\n\n\n\n<li>The water level<\/li>\n\n\n\n<li>The date of completion<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 5. GEOLOGICAL AND HYDROGEOLOGICAL CONDITIONS &#8211; INFORMATION NOTICE<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>IMPORTANT &#8211; NATURAL CONDITIONS AND LIMITATIONS OF LIABILITY<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Client acknowledges and accepts that:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Groundwater is a natural resource whose occurrence, depth, quality and quantity are determined by the geological and hydrogeological conditions of a given area, which are beyond the Contractor&#8217;s control.<\/li>\n\n\n\n<li>The Contractor has no influence on natural geological and hydrogeological processes, including:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The location and depth of aquifers<\/li>\n\n\n\n<li>The yield of natural groundwater sources<\/li>\n\n\n\n<li>The quality of water in aquifers<\/li>\n\n\n\n<li>Changes in the groundwater level caused by natural factors or human activity<\/li>\n\n\n\n<li>Seasonal fluctuations in the groundwater level<\/li>\n\n\n\n<li>The influence of other water intakes in the area (neighbours&#8217; wells, industrial intakes)<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Hydrogeological conditions may change over time, regardless of the quality of the borehole, in particular because of:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Other boreholes being drilled in the area (including by neighbours)<\/li>\n\n\n\n<li>Intensive abstraction of groundwater in the area<\/li>\n\n\n\n<li>Climate change and prolonged droughts<\/li>\n\n\n\n<li>Changes in land use in the area<\/li>\n\n\n\n<li>Natural geological processes<\/li>\n\n\n\n<li>Land drainage and hydrotechnical works in the area<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The Contractor does not guarantee:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The presence of water in the ground at a particular depth<\/li>\n\n\n\n<li>Constant availability of water over time throughout the life of the well<\/li>\n\n\n\n<li>An unchanging well yield in the future<\/li>\n\n\n\n<li>The chemical and bacteriological quality of the groundwater<\/li>\n\n\n\n<li>That the water level will remain unchanged<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Preliminary geological and hydrogeological analysis: before starting to drill, the Contractor analyses the available geological and hydrogeological data (maps, documentation from other boreholes in the area), however:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>This analysis is indicative only and does not constitute a guarantee that water is present<\/li>\n\n\n\n<li>Actual geological conditions may differ from the available data<\/li>\n\n\n\n<li>Conditions may differ even within a single plot<\/li>\n\n\n\n<li>The presence of water on a neighbour&#8217;s land does not guarantee its presence on the Client&#8217;s plot<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Pumping test:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The Contractor carries out the pumping test immediately after drilling the borehole<\/li>\n\n\n\n<li>The result of the pumping test reflects the hydrogeological conditions at the time of completion<\/li>\n\n\n\n<li>The yield established during the pumping test may change over time<\/li>\n\n\n\n<li>The pumping test does not constitute a guarantee of long-term availability of water<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 5A. FREE FLOW FROM A DEEP WELL &#8211; INFORMATION NOTICE<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>IMPORTANT: THE PHENOMENON OF FREE FLOW OF WATER<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Client acknowledges and accepts that:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Free flow (water flowing by itself to the ground surface from a deep well) is a natural phenomenon resulting from hydrogeological conditions and the hydrostatic pressure prevailing in the aquifer. Whether free flow occurs is entirely independent of the manner, quality and technology used by the Contractor to drill the borehole.<\/li>\n\n\n\n<li>The Contractor is unable to predict the occurrence of free flow before the borehole is drilled. The available geological and hydrogeological data do not make it possible to determine unambiguously whether water will flow out by itself under pressure at a given location.<\/li>\n\n\n\n<li>The Contractor is not liable for the occurrence of free flow from a deep well, in particular for:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Uncontrolled flow of water by itself onto the ground surface<\/li>\n\n\n\n<li>Flooding of the plot, neighbouring land or buildings as a result of free flow<\/li>\n\n\n\n<li>Material damage caused by water flowing out of the well by itself<\/li>\n\n\n\n<li>Soil erosion, undermining of foundations or other damage to infrastructure caused by free flow<\/li>\n\n\n\n<li>The costs of bringing under control, limiting or eliminating the free flow<\/li>\n\n\n\n<li>The need to apply specialist technical solutions to control the water pressure (e.g. installing non-return valves or pressure wellheads)<\/li>\n\n\n\n<li>Legal and administrative consequences arising from uncontrolled outflow of water, including any claims by third parties<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>If free flow occurs, the Client is obliged to:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Take immediate action to protect the land against the effects of uncontrolled outflow of water<\/li>\n\n\n\n<li>Report the phenomenon to the competent administrative authorities (if required by law)<\/li>\n\n\n\n<li>Bear all costs of bringing the free flow under control, including the costs of installing pressure-control devices<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>At the Client&#8217;s request and expense, the Contractor may propose technical solutions intended to limit or control free flow (e.g. installing a pressure wellhead or a non-return valve). The cost of such additional work is agreed individually and is not included in the standard price of the drilling service.<\/li>\n\n\n\n<li>The Client accepts that free flow may occur both immediately after the borehole is drilled and at a later stage of the well&#8217;s operation, as a result of changes in hydrogeological conditions (e.g. an increase in pressure in the aquifer after heavy rainfall, or seasonal changes). In each of these cases the Client is responsible for the consequences of the free flow.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 6. LIABILITY OF THE CONTRACTOR<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>The Contractor is liable for:<\/strong>\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Professional performance of the drilling service in accordance with good drilling practice and the applicable technical standards, including: correct drilling of the borehole, proper installation of the well casing, placing of the gravel pack, and the tightness of the well structure<\/li>\n\n\n\n<li>The quality of the materials used (well casing, gravel pack)<\/li>\n\n\n\n<li>Proper performance of the pumping test and preparation of a reliable report<\/li>\n\n\n\n<li>Damage caused directly by the Contractor&#8217;s actions while performing the service<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li><strong>The Contractor is NOT liable for:<\/strong>\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The absence of water, or an insufficient quantity of water, in the ground: where, despite the borehole having been drilled correctly to the agreed depth, no water is reached or its quantity is insufficient for the Client&#8217;s needs for geological and hydrogeological reasons<\/li>\n\n\n\n<li>A loss or reduction of well yield in the future for reasons independent of the quality of the borehole, in particular because of: other boreholes or water intakes made in the area by third parties (including neighbours), intensive abstraction of groundwater in the area by other parties, changes in natural hydrogeological conditions, prolonged droughts and climate change, changes in the groundwater level for natural or anthropogenic reasons, land drainage, hydrotechnical or construction works carried out by third parties<\/li>\n\n\n\n<li>The chemical and bacteriological quality of the water: testing water quality is not part of the standard service, and the Client is responsible for commissioning the appropriate tests<\/li>\n\n\n\n<li>The consequences of missing permits and consents: the Client bears full responsibility for holding all permits, consents and documents required by law<\/li>\n\n\n\n<li>Damage to underground installations that are unmarked or incorrectly indicated by the Client<\/li>\n\n\n\n<li>Delays in performance caused by: weather conditions that prevent safe working, unforeseen geological conditions (rock, boulders), force majeure (natural disasters, states of emergency, etc.)<\/li>\n\n\n\n<li>Seasonal fluctuations in well yield, which are a natural phenomenon connected with the hydrological cycle<\/li>\n\n\n\n<li>The occurrence of free flow (water flowing out by itself under pressure) from a deep well and any damage and costs connected with it, in accordance with the provisions of \u00a7 5A of these Terms of Service<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>If it is not possible to reach water at the agreed depth, the Contractor may propose:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Continuing to drill to a greater depth (for an additional fee)<\/li>\n\n\n\n<li>Drilling a borehole in another place on the plot (for an additional fee)<\/li>\n\n\n\n<li>Ending the work with payment for the metres actually drilled<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 7. WARRANTY<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>The Contractor gives a warranty for the drilling of the deep well borehole for a period of 24 months from the date of acceptance, covering:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The tightness of the well structure (casing, joints)<\/li>\n\n\n\n<li>The durability of the installed well casing<\/li>\n\n\n\n<li>The correct placing of the gravel pack<\/li>\n\n\n\n<li>Maintenance of the technical parameters of the yield confirmed at acceptance (provided that hydrogeological conditions remain unchanged)<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The warranty applies on condition that:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The well is used properly and for its intended purpose<\/li>\n\n\n\n<li>Regular inspections and maintenance are carried out by qualified persons<\/li>\n\n\n\n<li>Any irregularities are reported without delay<\/li>\n\n\n\n<li>Neither the Client nor third parties carry out any modifications or repairs to the well without the Contractor&#8217;s consent<\/li>\n\n\n\n<li>Water is abstracted in quantities not exceeding the yield confirmed during the pumping test<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The warranty does NOT cover:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Natural wear and tear of consumable components<\/li>\n\n\n\n<li>Mechanical damage occurring after acceptance (e.g. as a result of impact or ground settlement)<\/li>\n\n\n\n<li>A reduction in well yield caused by the external factors listed in \u00a7 5 and \u00a7 6<\/li>\n\n\n\n<li>Water contamination caused by external factors<\/li>\n\n\n\n<li>Damage resulting from improper use, lack of maintenance or force majeure<\/li>\n\n\n\n<li>Corrosion caused by an aggressive chemical composition of the water<\/li>\n\n\n\n<li>Damage caused by water freezing where the well enclosure is not adequately protected<\/li>\n\n\n\n<li>The consequences of improper operation of an installed pump (if the pump was not installed by the Contractor)<\/li>\n\n\n\n<li>The consequences of free flow and any damage connected with it, in accordance with \u00a7 5A of the Terms of Service<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Complaints procedure:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Complaints must be submitted without delay after a defect is found, and no later than within 7 days<\/li>\n\n\n\n<li>A complaint should contain: the Client&#8217;s details, a precise description of the problem and the date on which the defect was found<\/li>\n\n\n\n<li>The Contractor has the right to carry out an inspection and tests in order to establish the cause of the reported defect<\/li>\n\n\n\n<li>If a complaint is justified, the Contractor undertakes to remedy the defect within a period agreed with the Client<\/li>\n\n\n\n<li>If the defect turns out to be independent of the quality of the borehole (hydrogeological causes, actions of third parties, etc.), the Client bears the costs of travel and diagnostics<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 8. REMUNERATION AND PAYMENTS<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>The amount of remuneration for the service is set out in an individual offer and depends on:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The depth of the borehole<\/li>\n\n\n\n<li>The materials used<\/li>\n\n\n\n<li>The conditions of access to the plot<\/li>\n\n\n\n<li>The scope of additional services<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The standard price includes:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>Drilling (per linear metre)<\/li>\n\n\n\n<li>Installation of the well casing<\/li>\n\n\n\n<li>The gravel pack<\/li>\n\n\n\n<li>The pumping test<\/li>\n\n\n\n<li>A report of the work performed<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The Client may be required to pay an advance in the amount specified in the contract.<\/li>\n\n\n\n<li>The final settlement is made on the basis of the metres of borehole actually drilled and the materials actually used.<\/li>\n\n\n\n<li>Payment for the service should be made within the period stated on the invoice.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 9. COSTS IN THE CASE OF A DRY (NEGATIVE) BOREHOLE<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Where a dry (negative) borehole is drilled, that is, a borehole which, for geological and hydrogeological reasons, has not reached groundwater or has reached water in a quantity insufficient for use, the Client is obliged to pay a flat fee of <strong>PLN 150 gross<\/strong> (in words: one hundred and fifty zlotys).<\/li>\n\n\n\n<li>The fee referred to in paragraph 1 covers part of the costs incurred by the Contractor in connection with drilling the dry borehole, in particular the costs of: bringing the drilling equipment to the Client&#8217;s plot, preparing the drilling position, consumption of consumables, the working time of the drilling crew and depreciation of the equipment.<\/li>\n\n\n\n<li>The fee for a dry borehole is payable immediately after the drilling work is finished and it is established that there is no water or that the quantity of water is insufficient. The Contractor will issue the appropriate accounting document.<\/li>\n\n\n\n<li>If a decision is made to repeat the drilling in another place on the Client&#8217;s plot:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The fee for a dry borehole of PLN 150 gross is charged for each unsuccessful borehole, regardless of the result of subsequent drilling attempts.<\/li>\n\n\n\n<li>The fee for a dry borehole is added to the final settlement with the Client, regardless of whether the next borehole is successful (reaches water) or also turns out to be negative.<\/li>\n\n\n\n<li>Each subsequent dry borehole generates a separate fee of PLN 150 gross.<\/li>\n\n\n\n<li>Repeating the drilling in another place on the plot is agreed with the Client on each occasion and requires the Client&#8217;s written or oral consent.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>The fee for a dry borehole is non-refundable, including where a subsequent borehole drilled on the Client&#8217;s plot is successful and water is reached.<\/li>\n\n\n\n<li>By placing an order for the drilling of a borehole, the Client accepts the possibility of a dry borehole and undertakes to pay the fee specified in this section (\u00a7 9).<\/li>\n\n\n\n<li>The Contractor informs the Client of the result of the borehole immediately after the work is finished. In the case of a dry borehole, the Contractor will present the Client with a report stating that no water has been reached or that the quantity of water is insufficient, and will discuss with the Client the further options (repeating the drilling or withdrawing).<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 10. WITHDRAWAL FROM THE CONTRACT<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>The Client may withdraw from the contract before the work begins without giving a reason, reimbursing the costs incurred by the Contractor (e.g. transport of equipment, if it has already taken place).<\/li>\n\n\n\n<li>The Contractor may withdraw from the contract in the event of:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The equipment being unable to reach the drilling site<\/li>\n\n\n\n<li>Circumstances being found that make it impossible to perform the service (e.g. missing required permits)<\/li>\n\n\n\n<li>A lack of cooperation on the part of the Client<\/li>\n\n\n\n<li>Encountering geological conditions that make further drilling impossible (solid rock, boulders)<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>If the contract is withdrawn from after the work has begun, settlement is made in proportion to the scope of work actually performed.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 11. PROTECTION OF PERSONAL DATA<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>The controller of the Client&#8217;s personal data is the Contractor.<\/li>\n\n\n\n<li>Personal data is processed solely for the purpose of performing the contract and for purposes arising from the Contractor&#8217;s legitimate interests.<\/li>\n\n\n\n<li>The Client has the right of access to their data and the right to have it rectified, erased or its processing restricted.<\/li>\n\n\n\n<li>Detailed information on the processing of personal data is available in the Privacy Policy.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">\u00a7 12. FINAL PROVISIONS<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>In matters not regulated by these Terms of Service, the provisions of the Civil Code (Kodeks cywilny) and other applicable provisions of Polish law apply.<\/li>\n\n\n\n<li>The Contractor reserves the right to amend the Terms of Service. Amendments take effect 14 days after they are published on the website.<\/li>\n\n\n\n<li>Amendments to the Terms of Service do not apply to contracts concluded before the amendments took effect, unless the Client agrees to the application of the new Terms of Service.<\/li>\n\n\n\n<li>Any disputes arising from the performance of the contract will be settled by the court having jurisdiction over the Contractor&#8217;s registered office.<\/li>\n\n\n\n<li>The Terms of Service take effect on the date of their publication.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><br><br><br><br><br><br><br><br><br><br><br><br>CLIENT&#8217;S DECLARATION<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">While the deep well borehole service is being performed, the Client declares that they:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Have read the Terms of Service for Deep Well Drilling Services and accept all of their provisions without reservation.<\/li>\n\n\n\n<li>Understand and accept the limitations of the Contractor&#8217;s liability set out in \u00a7 5, \u00a7 5A and \u00a7 6 of the Terms of Service, and in particular acknowledge that:\n<ol style=\"list-style-type:lower-alpha\" class=\"wp-block-list\">\n<li>The Contractor does not guarantee the presence of water in the ground<\/li>\n\n\n\n<li>The Contractor does not guarantee constant availability of water in the future<\/li>\n\n\n\n<li>Well yield may change for reasons independent of the quality of the borehole<\/li>\n\n\n\n<li>Boreholes drilled by third parties (including neighbours) may affect the availability of water in the well<\/li>\n\n\n\n<li>The Contractor is not liable for the occurrence of free flow from a deep well or for any damage connected with it (in accordance with \u00a7 5A)<\/li>\n\n\n\n<li>In the case of a dry (negative) borehole, the Client undertakes to pay a fee of PLN 150 gross for each unsuccessful borehole (in accordance with \u00a7 9)<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Undertake to cooperate with the Contractor to the extent necessary for the proper performance of the service.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><br><br><br><br><br><br><strong>This document has been prepared on the basis of the applicable law, including:<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Civil Code (Kodeks cywilny)<\/li>\n\n\n\n<li>The Act of 20 July 2017, the Water Law Act (Prawo wodne)<\/li>\n\n\n\n<li>The Act of 7 July 1994, the Construction Law (Prawo budowlane)<\/li>\n\n\n\n<li>The Regulation of the Minister of Infrastructure of 12 April 2002 on the technical conditions to be met by buildings and their location (rozporz\u0105dzenie w sprawie warunk\u00f3w technicznych)<\/li>\n<\/ul>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-center kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;center&quot;,&quot;id&quot;:&quot;7747&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;0&quot;,&quot;title&quot;:&quot;TERMS AND CONDITIONS FOR DEEP WELL DRILLING SERVICES&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 0px; height: 0px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 0px;\">\n            <span class=\"kksr-muted\"><\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>TERMS OF SERVICE FOR DEEP WELL DRILLING SERVICES of 02.05.2023 \u00a7 1. GENERAL PROVISIONS \u00a7 2. DEFINITIONS For the purposes of these Terms of Service, the following definitions apply: \u00a7 3. SCOPE OF SERVICES \u00a7 4. RULES FOR PERFORMING THE ORDER \u00a7 5. GEOLOGICAL AND HYDROGEOLOGICAL CONDITIONS &#8211; INFORMATION NOTICE IMPORTANT &#8211; NATURAL CONDITIONS AND [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7747","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/pages\/7747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/comments?post=7747"}],"version-history":[{"count":3,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/pages\/7747\/revisions"}],"predecessor-version":[{"id":8448,"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/pages\/7747\/revisions\/8448"}],"wp:attachment":[{"href":"https:\/\/studniaglebinowa.eu\/en\/wp-json\/wp\/v2\/media?parent=7747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}