Deep well: cost, regulations, depth and construction

A deep well is a drilled well with a casing in the ground and a pump submerged in the water, giving a home and garden its own source of groundwater. Building a water intake of up to 30 m for ordinary use of water does not require a water-law permit, but whether it pays off depends on the conditions on your plot, how much water you use and the running costs. Legal position as at 16.11.2026. Below you will find a summary of the key topics, with links to the detailed articles.
Deep well: what it is and how it works
A deep well is made with a drilling rig, not by digging. The well casing stands in the borehole with a screen at the level of the aquifer, and a filter gravel pack is placed around the screen. A pump submerged in the casing pushes the water to the building, where a tank or a set with controls takes over.
A well built this way is also called a drilled well. ARCHE uses the percussion method and PVC-U well casings of 125 mm, or 110 mm in sandy ground with a thicker gravel pack. The principle of operation is covered in the article on how a deep well works, and the sequence of work from drilling to the pump is in the text on what building a deep well involves.
How deep is a deep well
The depth is determined by where the aquifer lies on your plot, not by a figure fixed in advance. The contractor establishes it during drilling, so it is worth stating in the contract how additional metres are charged and what happens if no suitable layer is found.
In the regulations one threshold matters: 30 m. The 30 m threshold applies to the depth of the intake for ordinary use of water, not to how convenient the drilling is. The price list also depends on it, starting with a borehole of up to 30 m. Details and guidance on how to assess the depth for your area are in the article on the depth of a deep well.
How much does a deep well cost
The price depends on the depth, the ground and the scope of work, so compare quotes with the same scope rather than just the price of one metre. In ARCHE’s offer a borehole of up to 30 m costs PLN 9,000 net, and each additional metre PLN 250 net. The full list is in the deep well price list, and how the metres are counted is explained in the article on the price of well drilling per metre.
| Item | Net price |
|---|---|
| Borehole up to 30 m | PLN 9,000 |
| Each additional metre | PLN 250 |
| Dry borehole (no water) | PLN 150 per metre |
| Pump installation | PLN 700 + materials |
| Complete well-to-house connection installation | PLN 1,500 + materials |
| Water sampling and testing | from PLN 1,200 (laboratory testing alone approx. PLN 400) |
The final quote depends on the conditions on the plot and the agreed work.
What makes up the cost of the project
In the cost estimate, separate the borehole, the casing and well screen, the pumping test, the final pump, the controls, the well enclosure and the connection to the building. Documentation, water testing and a water treatment system may be separate items. Fixed costs also include electricity for the pump, servicing and periodic water tests.
When your own well can lower your bills
The benefit is greater when water use is substantial, for example for watering, but it needs a calculation of your own. The costs of energy, servicing, testing and treatment remain with the owner. Water used in the house and discharged to the sewer may still be subject to a sewage charge.
The mains water price is the point of reference. In Kraków, from 1 February 2026, water costs PLN 6.76/m³ gross and sewage PLN 8.10/m³ gross, together PLN 14.86/m³ gross (Wodociągi Miasta Krakowa, checked on 16.11.2026, rates will change after 12 months). For example, 50 m³ of water a year for a garden comes to PLN 338 for the water alone at this rate. Compare that amount with the cost of the well, electricity and servicing.
Compare the annual cost of both options. You can work out a simple payback time as the additional capital outlay divided by the annual net savings. If the savings are zero or negative, there is no payback. Do not count in the savings any charges you will keep paying after the well is built. The well tax and charges depend on whether the water serves a home, farming or a business, so if in doubt, ask the municipal office.
Deep well: the regulations in brief
The regulations cover three separate matters: consent to build the intake and abstract water, geology, and the location of the well. Below is only a summary, because each of them is covered in separate articles.
Water-law permit and notification
Building an intake of up to 30 m for ordinary use of water, and abstraction averaging no more than 5 m³ per day over the year for the needs of your own household or farm, are exempt from a water-law permit and notification (Article 33 and Article 395 of the Water Law Act). These are separate conditions, one for building the intake and one for abstracting water. A deeper borehole, or use of water beyond ordinary use, requires you to check the correct procedure with Wody Polskie. The exemption does not remove location requirements, intake protection rules or geological regulations.
We cite the Water Law Act (Prawo wodne) according to the consolidated text, Dz.U. 2026 poz. 1335, in force on the date of checking. A full discussion of the conditions is in the article on when you need a permit for a deep well, and questions about the procedure at Wody Polskie are covered in the text on notifying a deep well.
Where the water serves a business, relying on ordinary use of water is usually not enough, so the procedure must be checked with Wody Polskie.
Geological regulations
Depending on the depth, the volume of water and the area, geological regulations may also apply, so there is no single rule for every well. Not every well is notified to the district office (starostwo).
A well built without the required permit
A well built without a required permit or notification can be legalised through Wody Polskie. The owner of an intake built before 18.08.2026 who submits a complete legalisation application by 31.12.2027 is exempt from the legalisation fee (Article 524a of the Water Law Act), and in that case no penalty is imposed for the lack of a permit or notification either. In 2026 the unit rate of the legalisation fee is PLN 6,601.67 according to the Wody Polskie page on legalising a water installation, and the rate for the following year is indexed. The conditions and procedure are described in the article on legalising a well and penalties.
Distance of a well from the plot boundary, buildings and a septic tank
The previous regulation on technical conditions ceased to apply in September 2026 and a new one has not yet been published, so distances from the boundary, septic tank and buildings are agreed with the designer and the district office (starostwo), based on previous practice and draft regulations. The Act of 31 July 2026 (Dz.U. 2026 poz. 1161) introduced a transitional period in the Construction Law, lasting 18 months from 20 September 2026. How it applies to well distances must be confirmed with the designer or the office.
Until recently, the values from § 31 of the repealed regulation were applied, measured from the axis of a well supplying drinking water and not requiring a protection zone. We give them only as previous values, not as an obligation.
| From what | Distance applied until now |
|---|---|
| Plot boundary | 5 m |
| Axis of a roadside ditch | 7.5 m |
| Livestock buildings, sealed silos, tanks for waste linked to livestock buildings, compost | 15 m |
| Drainage pipe for biologically treated sewage | 30 m |
| Unpaved animal runs, drainage without biological treatment, edge of a filtration field | 70 m |
The previous regulation also allowed a well to be placed closer to the plot boundary, provided the other distances were kept on both plots. It contained no general distance of 15 m from a dwelling house or 30 m from every sewer pipe. Details are in the text on the distance of a well from the plot boundary.
Is water from a deep well drinkable straight away
The depth of the borehole, clarity and the absence of any smell do not confirm that the water is fit to drink. Before drinking it you need microbiological and physicochemical tests in a suitable laboratory, and the scope of treatment is chosen according to the results. If you suspect contamination, use a safe source of water for drinking and preparing food; boiling alone does not remove chemical contaminants.
The State Sanitary Inspectorate (Sanepid) recommends testing well water before first use, at least once a year, and after flooding or a failure. Recommendations for owners of private wells are set out in the information from the district sanitary station (PSSE) in Sanok on safety rules for water from a private well. It recommends testing periodically and as a precaution, including after a septic tank flood or failure, but does not give a frequency. Testing a private well is recommended, not mandatory.
For drinking water, the parametric value for nitrates is 50 mg/l, and for E. coli and enterococci 0 in 100 ml (Regulation of the Minister of Health of 22.05.2026, Dz.U. 2026 poz. 748). Iron and manganese are indicator parameters and often exceed the values in water from deep wells. Treatment is then the solution, not proof that the well was built badly.
A well screen and gravel pack that hold back soil particles do not replace water treatment. Greater depth likewise does not guarantee the absence of bacteria, iron, manganese or other unwanted components. Deep water is sometimes cleaner microbiologically than water from a shallow well, but only a test will confirm it.
Deep well: advantages and disadvantages
The main advantage is independence from the mains and cheaper water for the garden when use is high. The main disadvantages are the initial cost, electricity, servicing and testing, and the fact that the yield only becomes known after drilling and pumping tests. The pumping test carried out after drilling helps here, showing how much water the intake gives.
A full comparison, including what speaks for your own intake and what for the mains, is in the article on the advantages and disadvantages of a deep well.
Where to start: next steps
The order of actions is the same for most plots.
- Check whether your planned water use and depth fall within ordinary use of water, and if in doubt, ask Wody Polskie.
- Choose the location on the plot together with the contractor and agree the distances with the designer or the district office (starostwo).
- Compare quotes with the same scope: borehole, casing, well screen, gravel pack, pumping test.
- Carry out the drilling and the pumping test, then select the pump and controls.
- Connect the well to the house and test the water before drinking it.
- Collect the documentation of the work and agree the warranty and servicing terms.
What to agree with the contractor before signing the contract
- The expected scope of investigation and how the yield of the intake will be confirmed.
- What the price covers, how additional metres are charged and what happens if no suitable aquifer is found.
- Selection of casing, screen and pump to suit the actual conditions.
- How the work will be accepted and the documentation handed over, and the warranty and servicing terms.
- The date of the water test before the water is used for drinking and cooking.
ARCHE operates in Lesser Poland and Silesia, carries out deep well drilling with a filter gravel pack and a pumping test, and gives a 2-year warranty on the work.
Planning to build or service an intake? Contact ARCHE to discuss the conditions on your plot and the scope of work.
Frequently asked questions
What is a deep well?
It is a well drilled by machine, with a well casing reaching the aquifer and a pump submerged in the water. It provides its own source of water for a home, garden or farm.
How deep is a deep well?
As deep as it takes to reach the aquifer on the given plot. The depth is determined during drilling, and in the regulations the 30 m threshold for ordinary use of water matters.
Can a deep well be built without a permit?
An intake of up to 30 m for the needs of your own household or farm is exempt from a water-law permit and notification, as long as abstraction does not exceed an annual average of 5 m³ per day. For greater depth, greater abstraction or business use, check the procedure with Wody Polskie.
Is water from a deep well drinkable?
You cannot know without testing. Water from any private well needs to be tested in a laboratory before drinking, and the results decide on treatment.
What are the disadvantages of a deep well?
It requires an outlay for the borehole, electricity for the pump, servicing and water tests. The yield and quality of the water depend on hydrogeological conditions that cannot be reliably assessed before drilling.
Do I need to check distances from the boundary and the septic tank?
Yes, but the regulations are changing. The 2002 regulation ceased to apply in September 2026, so the location is agreed with the designer and the district office (starostwo).
Sources
- Prawo wodne, consolidated text, Dz.U. 2026 poz. 1335 - Article 33, Article 395 and Article 524a, checked on 16.11.2026
- Rozporządzenie Ministra Zdrowia z 22.05.2026 (water quality), Dz.U. 2026 poz. 748 - parametric values for drinking water, checked on 16.11.2026
- Wody Polskie: legalizacja urządzenia wodnego - application and legalisation fee rate for 2026, checked on 16.11.2026
- PSSE in Sanok: water from a private well, basic safety rules - when to test well water, checked on 16.11.2026
- Ustawa z 31.07.2026, Dz.U. 2026 poz. 1161 - transitional period after the regulation on technical conditions ceased to apply
- Wodociągi Miasta Krakowa: taryfa i cenniki - price of water and sewage in Kraków, checked on 16.11.2026